A Simulation Study on the Automated Container Storage Yard Cranes System

被引:1
|
作者
Yang, Yang [1 ]
Zhang, XinJian [1 ]
Wu, Zhenhui [1 ]
机构
[1] Shanghai Maritime Univ, Sch Logist Engn, Shanghai, Peoples R China
来源
TRANSDISCIPLINARY ENGINEERING: A PARADIGM SHIFT | 2017年 / 5卷
关键词
Automated container storage yard system; automated container terminal; lift AGV; Railmounted Gantry Cranes (RMG) Scheduling; simulation; LOADING OUTBOUND CONTAINERS; TERMINALS; DEPLOYMENT; ALGORITHM;
D O I
10.3233/978-1-61499-779-5-693
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we introduce a configuration of container storage yard, in which lift AGVs and shuttle carrier are used. We address the approach for building one detailed simulation system for this automated container storage yard system. Simulation frame, several control logic and decision making rules are presented. Simulation experiments for scheduling triple RMG cranes are carried out to evaluate the effects of the scheduling strategy. The objective of the study is to maximize the productivity of the system, which might be applied to import containers set and export containers set at the same time.
引用
收藏
页码:693 / 700
页数:8
相关论文
共 50 条
  • [1] Noisy Optimization of Dispatching Policy for the Cranes at the Storage Yard in an Automated Container Terminal
    Kim, Jeongmin
    Hong, Ellen J.
    Yang, Youngjee
    Ryu, Kwang Ryel
    APPLIED SCIENCES-BASEL, 2021, 11 (15):
  • [2] Optimal Scheduling Model of Yard Cranes in Container Yard
    Guo, Jianquan
    Kun, Fan
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2010, 9 : 371 - 375
  • [3] Integrated Optimization of Storage Space Allocation and Multiple Yard Cranes Scheduling in a Container Terminal Yard
    Fan H.
    Ma M.
    Yao X.
    Guo Z.
    1600, Shanghai Jiaotong University (51): : 1367 - 1373
  • [4] Virtainer:: Graphical simulation of container storage yard
    Escrivá, M
    Martí, M
    Sánchez, JM
    Camahort, E
    Lluch, J
    Vivó, R
    ISC'2005: 3RD INDUSTRIAL SIMULATION CONFERENCE 2005, 2005, : 244 - 248
  • [5] Scheduling automated triple cross-over stacking cranes in a container yard
    Ulrich Dorndorf
    Frank Schneider
    OR Spectrum, 2010, 32 : 617 - 632
  • [6] Scheduling automated triple cross-over stacking cranes in a container yard
    Dorndorf, Ulrich
    Schneider, Frank
    OR SPECTRUM, 2010, 32 (03) : 617 - 632
  • [7] Integrated scheduling optimization of AGV and double yard cranes in automated container terminals
    Zhang, Xiaoju
    Li, Huijuan
    Sheu, Jiuh-Biing
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2024, 179
  • [8] Study on optimal allocation model of yard cranes in container port
    Guo, Jianquan
    Liang, Chengji
    PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 153 - 156
  • [9] A comparison of various yard cranes in container terminals
    Lee, Byung Kwon
    Kim, Kap Hwan
    Proceedings of the Fourth International Conference on Information and Management Sciences, 2005, 4 : 412 - 412
  • [10] A DECISION SUPPORT SYSTEM FOR THE ALLOCATION OF YARD CRANES AND BLOCKS IN CONTAINER TERMINALS
    Zhang, Canrong
    Zhang, Zhihai
    Zheng, Li
    Miao, Lixin
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2011, 28 (06) : 803 - 829