Towards smart thermal grids: Techno-economic feasibility of commercial heat-to-power technologies for district heating

被引:12
作者
Hennessy, Jay [1 ,2 ]
Li, Hailong [1 ]
Wallin, Fredrik [1 ]
Thorin, Eva [1 ]
机构
[1] Malardalen Univ, Sch Business Soc & Engn, SE-72123 Vasteras, Sweden
[2] RISE Res Inst Sweden, Box 857, SE-50115 Boras, Sweden
关键词
District heating; Heat to power; LCOE; Thermal grids; Smart grids; Ancillary services; PUMPS; INTEGRATION; SYSTEMS; ORC; RECOVERY; DENMARK; CYCLES; TRENDS;
D O I
10.1016/j.apenergy.2018.06.105
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Recent improvements in low-temperature heat-to-power (LTHtP) technologies have led to an increase in efficiency at lower temperatures and lower cost. LTHtP has so far not been used in district heating. The aim of the study is to establish under what conditions the use of existing LTHtP technology is technically and economically feasible using a district heating system as the heat source. The organic Rankine cycle (ORC) is identified as the most interesting LTHtP technology, due to its high relative efficiency and the commercial availability of devices operating at temperatures in the district heating operating range. The levelised cost of electricity of several ORC devices is calculated for temperatures found in district heating, assuming a zero cost of heat. A case study from Sweden is used to calculate the levelised cost of electricity, the net present value and payback period, based on income from the electricity produced, excluding taxes. Hourly spot market electricity prices from 2017 are used, as well as forecast scenarios for 2020, 2030 and 2040. A sensitivity study tests the importance of electricity price, cost of heat and capital/installation cost. Based on the case study, the best levelised cost of electricity achieved was 26.5 EUR/MWh, with a payback period greater than 30 years. Under current Swedish market conditions, the ORC does not appear to be economically feasible for use in district heating, but the net present value and payback period may be significantly more attractive under other countries' market conditions or with reduced capital costs. For a positive net present value in the Swedish market the capital cost should be reduced to 1.7 EUR/W installed, or the average electricity price should be at least 35.2 EUR/MWh, if the cost of heat is zero. The cost of heat is an important factor in these calculations and should be developed further in future work.
引用
收藏
页码:766 / 776
页数:11
相关论文
共 44 条
[1]  
Againity AB, 2017, WELCOME TO AGAINITY
[2]  
[Anonymous], 2017, REN 2017
[3]  
[Anonymous], 2012, WAST HEAT POW SYST
[4]  
Averfalk Helge., 2014, Proceedings from the 14th International Symposium on District Heating and Cooling: September, 6-10, 2014: Stockholm, Sweden, Stockholm, P469, DOI DOI 10.3354/MEPS07474
[5]   Integration of large-scale heat pumps in the district heating systems of Greater Copenhagen [J].
Bach, Bjarne ;
Werling, Jesper ;
Ommen, Torben ;
Munster, Marie ;
Morales, Juan M. ;
Elmegaard, Brian .
ENERGY, 2016, 107 :321-334
[6]  
BCS, 2008, WAST HEAT REC TECHN
[7]  
Blumsack Seth., 2014, Project Decision Metrics: Levelized Cost of Energy (LCOE)
[8]   Potential of the Power-to-Heat Technology in District Heating Grids in Germany [J].
Boettger, Diana ;
Goetz, Mario ;
Lehr, Nelly ;
Kondziella, Hendrik ;
Bruckner, Thomas .
8TH INTERNATIONAL RENEWABLE ENERGY STORAGE CONFERENCE AND EXHIBITION (IRES 2013), 2014, 46 :246-253
[9]   Exergetic and economic comparison of ORC and Kalina cycle for low temperature enhanced geothermal system in Brazil [J].
Campos Rodriguez, Carlos Eymel ;
Escobar Palacio, Jose Carlos ;
Venturini, Osvaldo J. ;
Silva Lora, Electo E. ;
Cobas, Vladimir Melian ;
dos Santos, Daniel Marques ;
Lofrano Dotto, Fabio R. ;
Gialluca, Vernei .
APPLIED THERMAL ENGINEERING, 2013, 52 (01) :109-119
[10]  
Climeon AB, 2017, TURNING WASTE HEAT V