Slum relocation projects in Bangkok: what has contributed to their success or failure?

被引:41
作者
Viratkapan, V [1 ]
Perera, R [1 ]
机构
[1] Asian Inst Technol, Sch Environm Resources & Dev, Urban Environm Management Field Study, Klongluang 12120, Pathumthani, Thailand
关键词
slum relocation; Bangkok; success; failure;
D O I
10.1016/j.habitatint.2004.09.002
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
Many slum relocation projects have been implemented in Bangkok during the last three decades. Studies conducted on some of these projects have focused on the impacts of resettlement on slum dwellers, while a few have focused on the process of slum relocation. This paper presents the findings of an empirical study on factors that influence the post-relocation performance of such projects. The study reveals that there are a number of pre-requisites for achieving success. These include factors external to the community such as the location of the new settlement and award of compensation and factors internal to the community such as unity, availability of strong leadership, active participation and positive attitude of community members. The study finds that slum relocation projects require specialized activities in the consolidation stage, in order to sustain the momentum generated at the eviction and transition stage of the projects. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:157 / 174
页数:18
相关论文
共 22 条
[1]  
*ADB, 1998, HDB RESETTLEMENT GUI
[2]  
*AMA, 2000, PREF STRUCT MEAS CON
[3]  
[Anonymous], 1993, Relocation and resettlement manual: Guide to managing and planning relocation
[4]  
[Anonymous], 2003, CHALL SLUMS GLOB REP
[5]  
Cernea M. M., 1988, World Bank Technical Paper
[6]  
*CODI, 2000, UNPUB URB LOW INC TH
[7]  
*FRSN, 2000, SLUM SETTLEMENTS PRO
[8]  
*HSF, 1998, FORCED EVICTIONS HOU, P145
[9]   ATTRIBUTES OF INFORMAL SETTLEMENTS AFFECTING THEIR VULNERABILITY TO EVICTION - A STUDY OF BANGKOK [J].
KHAN, SA .
ENVIRONMENT AND URBANIZATION, 1994, 6 (01) :25-39
[10]  
MISRA KG, 1981, RESETTLEMENT POLICIE