Bi-objective single machine scheduling problem with stochastic processing times

被引:15
作者
Salmasnia, Ali [1 ]
Khatami, Mostafa [2 ]
Kazemzadeh, Reza Baradaran [2 ]
Zegordi, Seyed Hessameddin [2 ]
机构
[1] Univ Qom, Fac Engn & Technol, Dept Ind Engn, Qom, Iran
[2] Tarbiat Modares Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Scheduling; Stochastic programming; Goal programming; Single machine; Mean completion time; Earliness and tardiness costs; TARDINESS PENALTIES; ASYMMETRIC EARLINESS; TARDY JOBS; DUE-DATE; COSTS; NUMBER;
D O I
10.1007/s11750-014-0337-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, a static single machine scheduling problem is investigated, where processing times are stochastic, due dates are deterministic and inserted idle time is allowed. Two objective functions are simultaneously taken into account, minimization of mean completion time and minimization of earliness and tardiness costs. A robust model is presented to tackle the problem, based on goal programming and a stochastic programming model named E-model. The proposed model not only obtains optimal operating systems, but also considers the variance of the objective functions and the correlation between them. Moreover, chance-constrained programming model is used to take into account the randomness in the constraints of the model. The model is presented with general distribution of processing times and the normal case is explored in experiments. Two sets of computational experiments are presented to test the efficiency of the proposed model. In the first set, the performance obtained by the bi-objective formulation is measured, where in the second set the performance obtained by incorporating robustness is measured. Results confirm the effectiveness of the proposed model, in both directions.
引用
收藏
页码:275 / 297
页数:23
相关论文
共 32 条
[21]  
Lasserre J., 1992, P 2 INTEGER PROGRAMM, P136
[22]   A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem [J].
Liaw, CF .
COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (07) :679-693
[24]   Setting due dates in a stochastic single machine environment [J].
Portougal, V ;
Trietsch, D .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (06) :1681-1694
[25]   Scheduling problems with random processing times under expected earliness/tardiness costs [J].
Qi, XD ;
Yin, G ;
Birge, JR .
STOCHASTIC ANALYSIS AND APPLICATIONS, 2000, 18 (03) :453-473
[26]   Single machine stochastic scheduling to minimize the expected number of tardy jobs using mathematical programming models [J].
Seo, DK ;
Klein, CA ;
Jang, W .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (02) :153-161
[27]   Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem [J].
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) :266-287
[28]   Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs [J].
Soroush, HM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (02) :450-468
[29]   THE STOCHASTIC SINGLE-MACHINE SCHEDULING PROBLEM WITH EARLINESS AND TARDINESS COSTS [J].
SOROUSH, HM ;
FREDENDALL, LD .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 77 (02) :287-302
[30]   Single machine stochastic JIT scheduling problem subject to machine breakdowns [J].
Tang HengYong ;
Zhao ChuanLi ;
Cheng CongDian .
SCIENCE IN CHINA SERIES A-MATHEMATICS, 2008, 51 (02) :273-292