Bi-objective single machine scheduling problem with stochastic processing times

被引:15
作者
Salmasnia, Ali [1 ]
Khatami, Mostafa [2 ]
Kazemzadeh, Reza Baradaran [2 ]
Zegordi, Seyed Hessameddin [2 ]
机构
[1] Univ Qom, Fac Engn & Technol, Dept Ind Engn, Qom, Iran
[2] Tarbiat Modares Univ, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Scheduling; Stochastic programming; Goal programming; Single machine; Mean completion time; Earliness and tardiness costs; TARDINESS PENALTIES; ASYMMETRIC EARLINESS; TARDY JOBS; DUE-DATE; COSTS; NUMBER;
D O I
10.1007/s11750-014-0337-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, a static single machine scheduling problem is investigated, where processing times are stochastic, due dates are deterministic and inserted idle time is allowed. Two objective functions are simultaneously taken into account, minimization of mean completion time and minimization of earliness and tardiness costs. A robust model is presented to tackle the problem, based on goal programming and a stochastic programming model named E-model. The proposed model not only obtains optimal operating systems, but also considers the variance of the objective functions and the correlation between them. Moreover, chance-constrained programming model is used to take into account the randomness in the constraints of the model. The model is presented with general distribution of processing times and the normal case is explored in experiments. Two sets of computational experiments are presented to test the efficiency of the proposed model. In the first set, the performance obtained by the bi-objective formulation is measured, where in the second set the performance obtained by incorporating robustness is measured. Results confirm the effectiveness of the proposed model, in both directions.
引用
收藏
页码:275 / 297
页数:23
相关论文
共 32 条
[1]  
[Anonymous], 1997, Introduction to stochastic programming
[2]  
[Anonymous], 2004, Handbook of Scheduling: Algorithms, Models, and Performance Analysis
[3]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[4]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[5]   Stochastic single machine scheduling with random common due date [J].
Benmansour, Rachid ;
Allaoui, Hamid ;
Artiba, Abdelhakim .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (13) :3560-3571
[6]  
Cai X, 1997, NAV RES LOG, V44, P531, DOI 10.1002/(SICI)1520-6750(199709)44:6<531::AID-NAV2>3.0.CO
[7]  
2-4
[8]   Asymmetric earliness and tardiness scheduling with exponential processing times on an unreliable machine [J].
Cai, XQ ;
Zhou, X .
ANNALS OF OPERATIONS RESEARCH, 2000, 98 (1-4) :313-331
[9]   A branch and bound approach for single machine scheduling with earliness and tardiness penalties [J].
Chang, PC .
COMPUTERS & MATHEMATICS WITH APPLICATIONS, 1999, 37 (10) :133-144
[10]   CHANCE-CONSTRAINED PROGRAMMING [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1959, 6 (01) :73-79