Study on Comprehensive Evaluation of Construction Project Management Dynamic Effect

被引:0
作者
Huang, Guilin [1 ]
Zhou, Shuhui [1 ]
机构
[1] NE Forestry Univ, Sch Civil Engn, Harbin, Peoples R China
来源
PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3 | 2010年
关键词
project management; dynamic effect; model of comprehensive evaluation; method of dynamic fuzzy evaluation;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the development of construction technology, modem construction projects have become larger, more comprehensive, and have more capital, more advanced technology, and more risk. That increases the difficulty of management, which makes that the only final effect evaluation is not enough. We need to know different operation status and operation effect during the process of management. Sometimes, as an investor, or a designer, or a builder, he needs to compare the different effects of different projects. That is the dynamic evaluation of construction project management effect. This paper sets up an evaluation model of construction project dynamic effect based on the theory of dynamic comprehensive evaluation, and uses the method of dynamic fuzzy evaluation to evaluate dynamic effect during the period of the same project, or among the different projects.
引用
收藏
页码:593 / 596
页数:4
相关论文
共 7 条
[1]  
FENG H, 2002, RES DEGREE POSTGRADU, V2, P59
[2]  
GUO Y, 2001, NE U MANAGEMENT SCI, V21, P464
[3]  
Guo Yajun, 2002, MANAGEMENT SCI J, V5, P49
[4]  
GUO YJ, 2002, THEORY METHODS COMPR
[5]  
REN H, 2001, BUILDING MAT IND PUB, V6, P33
[6]  
TIAN J, 2009, CONSTRUCTION PROJECT
[7]  
YE Y, 2005, COMPREHENSIVE ASSESS