Predicting on-time performance in scheduled railroad operations: Methodology and application to train scheduling

被引:35
作者
Hallowell, SF
Harker, PT [1 ]
机构
[1] Univ Penn, Dept Operat & Informat Management, Philadelphia, PA 19104 USA
[2] USAF, Operat Res Grp, Arlington, VA 22227 USA
基金
美国国家科学基金会;
关键词
railroads; stochastic scheduling; computer assisted dispatching;
D O I
10.1016/S0965-8564(97)00009-8
中图分类号
F [经济];
学科分类号
02 ;
摘要
In previous work, the authors developed an analytical line delay model for analyzing rail line-haul operations, and validated the model as a predictive tool. This paper examines the application of the model as a prescriptive tool for the generation of train schedules. A unique feature of the model is that it incorporates dynamic meet/pass priorities in order to approximate an optimal meet/pass planning process. Extensive Monte Carlo simulations are conducted to examine the application of the model for adjusting real-world schedules to improve on-time performance and reduce delay. This empirical work represents the first attempt to investigate the impacts of the scheduling methodology on on-time line-haul performance. The problems are based on historical data from a major North American railroad. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:279 / 295
页数:17
相关论文
共 23 条
[11]  
Jovanovic D., 1990, J TRANSPORTATION RES, V31, P25
[12]   OPTIMAL PACING OF TRAINS IN FREIGHT RAILROADS - MODEL FORMULATION AND SOLUTION [J].
KRAAY, D ;
HARKER, PT ;
CHEN, BT .
OPERATIONS RESEARCH, 1991, 39 (01) :82-99
[13]   REAL-TIME SCHEDULING OF FREIGHT RAILROADS [J].
KRAAY, DR ;
HARKER, PT .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1995, 29 (03) :213-229
[14]  
LANG AS, 1972, R7274 MIT TRANSP SYS, V8
[15]  
Law A. M. E., 1991, SIMULATION MODELING
[16]   PMAKE ANALYSIS - PREDICTING RAIL YARD TIME DISTRIBUTIONS USING PROBABILISTIC TRAIN CONNECTION STANDARDS [J].
MARTLAND, CD .
TRANSPORTATION SCIENCE, 1982, 16 (04) :476-506
[17]  
MARTLAND CD, 1993, SERVICE MANAGEMENT R
[18]  
MARTLAND CD, 1990, J TRANSPORTATION RES, V30, P286
[19]   A COMPARISON OF THREE METHODS FOR SELECTING VALUES OF INPUT VARIABLES IN THE ANALYSIS OF OUTPUT FROM A COMPUTER CODE [J].
MCKAY, MD ;
BECKMAN, RJ ;
CONOVER, WJ .
TECHNOMETRICS, 1979, 21 (02) :239-245
[20]  
MOODY HG, 1993, AAR FRA TRB C RAILR