Predicting on-time performance in scheduled railroad operations: Methodology and application to train scheduling

被引:35
作者
Hallowell, SF
Harker, PT [1 ]
机构
[1] Univ Penn, Dept Operat & Informat Management, Philadelphia, PA 19104 USA
[2] USAF, Operat Res Grp, Arlington, VA 22227 USA
基金
美国国家科学基金会;
关键词
railroads; stochastic scheduling; computer assisted dispatching;
D O I
10.1016/S0965-8564(97)00009-8
中图分类号
F [经济];
学科分类号
02 ;
摘要
In previous work, the authors developed an analytical line delay model for analyzing rail line-haul operations, and validated the model as a predictive tool. This paper examines the application of the model as a prescriptive tool for the generation of train schedules. A unique feature of the model is that it incorporates dynamic meet/pass priorities in order to approximate an optimal meet/pass planning process. Extensive Monte Carlo simulations are conducted to examine the application of the model for adjusting real-world schedules to improve on-time performance and reduce delay. This empirical work represents the first attempt to investigate the impacts of the scheduling methodology on on-time line-haul performance. The problems are based on historical data from a major North American railroad. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:279 / 295
页数:17
相关论文
共 23 条
[1]   THE IMPORTANCE OF TIME IN TRANSIT AND RELIABILITY OF TRANSIT-TIME FOR SHIPPERS, RECEIVERS, AND CARRIERS [J].
ALLEN, WB ;
MAHMOUD, MM ;
MCNEIL, D .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1985, 19 (05) :447-456
[2]   2 MOMENTS ESTIMATION OF THE DELAY ON SINGLE-TRACK RAIL LINES WITH SCHEDULED TRAFFIC [J].
CHEN, BT ;
HARKER, PT .
TRANSPORTATION SCIENCE, 1990, 24 (04) :261-275
[3]  
HALLOWELL S, 1993, THESIS U PENNSYLVANI
[4]   Predicting on-time line-haul performance in scheduled railroad operations [J].
Hallowell, SF ;
Harker, PT .
TRANSPORTATION SCIENCE, 1996, 30 (04) :364-378
[5]  
HALLOWELL SF, 1991, DEP OPERATIONS INFOR
[6]   SERVICES AND TECHNOLOGY - REENGINEERING THE RAILROADS [J].
HARKER, PT .
INTERFACES, 1995, 25 (03) :72-80
[7]  
HARKER PT, 1991, TRANSPORT RES REC, V1314, P21
[8]  
HARKER PT, 1989, TRANSPORT RES REC, V1263, P101
[9]  
HERTENSTEIN JH, 1991, BURLINGTON N ARES DE
[10]   TACTICAL SCHEDULING OF RAIL OPERATIONS - THE SCAN-I SYSTEM [J].
JOVANOVIC, D ;
HARKER, PT .
TRANSPORTATION SCIENCE, 1991, 25 (01) :46-64