共 26 条
[1]
Al-Tabtabai H., 1999, ENG CONSTR ARCHIT MA, V6, P121, DOI [10.1108/eb021105, DOI 10.1108/EB021105]
[2]
ASHLEY DB, 1980, J CONSTRUCT DIV-ASCE, V106, P185
[4]
BADIRU AB, 1993, INT J PROJ MANAG, V24, P15
[6]
APPLICATION OF LINEAR SCHEDULING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1986, 112 (04)
:476-491
[7]
Optimizing Resource Leveling in Construction Projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2009, 135 (11)
:1172-1180
[9]
Linear scheduling model: Development of controlling activity path
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (04)
:263-268
[10]
Scheduling projects with repeating activities
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (04)
:269-278