An optimal repair-replacement policy for a cold standby system with use priority

被引:8
|
作者
Zhang, Yuan Lin [1 ]
Wang, Guan Jun [1 ]
机构
[1] Southeast Univ, Dept Math, Nanjing 210096, Peoples R China
基金
中国国家自然科学基金;
关键词
Geometric process; Renewal process; Priority; Replacement policy; Renewal reward theorem; Convolution; GEOMETRIC PROCESS MODEL; OUT-OF-N; AGE REPLACEMENT; MAINTENANCE MODEL; RELIABILITY;
D O I
10.1016/j.apm.2010.08.009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the maintenance problem for a cold standby system consisting of two dissimilar components and one repairman is studied. Assume that both component 1 and component 2 after repair follow geometric process repair and component 1 is given priority in use when both components are workable. Under these assumptions, using geometric process repair model, we consider a replacement policy N under which the system is replaced when the number of failures of component 1 reaches N. Our purpose is to determine an optimal replacement policy N* such that the average cost rate (i.e. the long-run average cost per unit time) of the system is minimized. The explicit expression for the average cost rate of the system is derived and the corresponding optimal replacement policy N* can be determined analytically or numerically. Finally, a numerical example is given to illustrate some theoretical results and the model applicability. (C) 2010 Elsevier Inc. All rights reserved.
引用
收藏
页码:1222 / 1230
页数:9
相关论文
共 50 条
  • [21] A hybrid repair-replacement policy in the proportional hazards model
    Zheng, Rui
    Wang, Jingjing
    Zhang, Yingzhi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 304 (03) : 1011 - 1021
  • [22] THE PRIORITY STANDBY SYSTEM MODEL WITH REPLACEMENT
    CASTRO, JV
    SOLOVEV, AD
    VESTNIK MOSKOVSKOGO UNIVERSITETA SERIYA 1 MATEMATIKA MEKHANIKA, 1986, (02): : 34 - 39
  • [23] The Asymptotical Stability Of a Warm Standby System with Priority in Use And Repair
    Sun, Hongjun
    Ma, Lixia
    2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 5038 - 5043
  • [24] A cold standby system with repair and replacement policies and correlated failure and repair times
    Gupta, Rakesh
    Mumtaz, S.Z.
    Journal of Quality in Maintenance Engineering, 1995, 1 (04): : 56 - 66
  • [25] A repair-replacement policy for a system subject to missions of random types and random durations
    Zheng, Rui
    Zhao, Xufeng
    Hu, Chaoming
    Ren, Xiangyun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 232
  • [26] Reliability modelling of a parallel-cold standby system with proviso of repair priority
    Malik, S. C.
    Rathi, Puran
    Nandal, N.
    JOURNAL OF STATISTICS AND MANAGEMENT SYSTEMS, 2023, 26 (04) : 867 - 883
  • [27] Optimal preventive replacement policy for homogeneous cold standby systems with reusable elements
    Levitin, Gregory
    Finkelstein, Maxim
    Dai, Yuanshun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 204
  • [28] Optimal preventive replacement policy for homogeneous cold standby systems with reusable elements
    Levitin, Gregory
    Finkelstein, Maxim
    Dai, Yuanshun
    Reliability Engineering and System Safety, 2020, 204
  • [29] Optimal Repair Policy for a System with Two Unit Deteriorating Standby System
    Yuan Wenzhi
    Xu Genqi
    2011 30TH CHINESE CONTROL CONFERENCE (CCC), 2011, : 1871 - 1876
  • [30] Replacement policy of cold standby repairable system with single repairman vacation
    Tan, Lijiao
    Meng, Xianyun
    Liu, Wenjuan
    Zhang, Xinxin
    Chen, Shengqiang
    Journal of Computational Information Systems, 2013, 9 (19): : 7695 - 7702