An improved algorithm to minimize the total completion time in a two-machine no-wait flowshop with uncertain setup times

被引:8
作者
Allahverdi, Muberra [1 ]
机构
[1] Kean Univ, Sch Nat Sci, Dept Math Sci, 1000 Morris Ave, Union, NJ 07083 USA
关键词
Flowshop scheduling; No-wait; Setup time; Uncertainty; Total completion time; SCHEDULING PROBLEMS; BOUNDED SETUP; TARDY JOBS; NUMBER; SHOPS;
D O I
10.5267/j.jpm.2021.9.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Since scheduling literature has a wide range of uncertainties, it is crucial to take these into account when solving performance measure problems. Otherwise, the performance may severely be affected in a negative way. In this paper, an algorithm is proposed to minimize the total completion time (TCT) of a two-machine no-wait flowshop with uncertain setup times within lower and upper bounds. The results are compared to the best existing algorithm in scheduling literature: the programming language Python is used to generate random samples with respect to various distributions, and the TCT of the proposed algorithm is compared to that of the best existing one. Results reveal that the proposed one significantly outperforms the best one given in literature for all considered distributions. Specifically, the average percentage improvement of the proposed algorithm over the best existing one is over 90%. A test of hypothesis is conducted to further confirm the results. (C) 2022 Growing Science Ltd. All rights reserved.
引用
收藏
页码:1 / 12
页数:12
相关论文
共 19 条
[1]   Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times [J].
Allahverdi, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (01) :386-400
[2]  
Allahverdi A., 2005, IJAM, V8, P145
[3]  
Allahverdi A, 2006, KUWAIT J SCI ENG, V33, P233
[4]   A survey of scheduling problems with no-wait in process [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 255 (03) :665-686
[5]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[6]   MINIMIZING TOTAL COMPLETION TIME IN A TWO-MACHINE NO-WAIT FLOWSHOP WITH UNCERTAIN AND BOUNDED SETUP TIMES [J].
Allahverdi, Muberra ;
Allahverdi, Ali .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2020, 16 (05) :2439-2457
[7]  
[Anonymous], 2003, Int. J. Math. Math. Sci.
[8]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[9]   SCHEDULING JOBS, WITH EXPONENTIALLY DISTRIBUTED PROCESSING TIMES, ON 2 MACHINES OF A FLOW SHOP [J].
CUNNINGHAM, AA ;
DUTTA, SK .
NAVAL RESEARCH LOGISTICS, 1973, 20 (01) :69-81
[10]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525