Multi-manned assembly line synchronization with compatible mounting positions, equipment sharing and workers cooperation

被引:7
作者
Ferrari, Emilio [1 ]
Faccio, Maurizio [2 ]
Gamberi, Mauro [1 ]
Margelli, Silvia [1 ]
Pilati, Francesco [1 ]
机构
[1] Univ Bologna, Dept Ind Engn, Viale Risorgimento 2, I-40136 Bologna, Italy
[2] Univ Padua, Dept Ind Syst Engn, Stradella San Nicola 3, I-36100 Vicenza, Italy
关键词
Multi-manned assembly line; Synchronization; Equipment sharing; Mounting position; Automotive; Balancing; SYSTEM;
D O I
10.1016/j.ifacol.2019.11.412
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The assembly of large and complex products as cars typically involves a huge amount of production resources as workers, pieces of equipment and layout areas. Multi-manned workstations commonly characterize these assembly lines along with some additional features such as compatibility/incompatibility between the different mounting positions, equipment sharing and worker cooperation. The simultaneous management of all such aspects significantly increases the balancing problem complexity. This paper proposes a new mixed integer programming model for such multi-manned assembly line synchronization problem to simultaneously optimize the line efficiency, the line length and the workload smoothness. A customized procedure based on a simulated annealing algorithm is developed to effectively solve this problem. The aforementioned procedure is validated through an industrial case study of an Italian sports car manufacturer distinguished by 665 tasks and numerous synchronization constraints typical of real assembly lines. (C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1502 / 1507
页数:6
相关论文
共 14 条
[1]   Mixed model line balancing with parallel stations, zoning constraints, and ergonomics [J].
Alghazi, Anas ;
Kurz, Mary E. .
CONSTRAINTS, 2018, 23 (01) :123-153
[2]   Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure [J].
Becker, Christian ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (02) :359-374
[3]   Motion Analysis System (MAS) for production and ergonomics assessment in the manufacturing processes [J].
Bortolini, Marco ;
Faccio, Maurizio ;
Gamberi, Mauro ;
Pilati, Francesco .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 139
[4]   Assembly system design in the Industry 4.0 era: a general framework [J].
Bortolini, Marco ;
Ferrari, Emilio ;
Gamberi, Mauro ;
Pilati, Francesco ;
Faccio, Maurizio .
IFAC PAPERSONLINE, 2017, 50 (01) :5700-5705
[5]   Multi-objective assembly line balancing considering component picking and ergonomic risk [J].
Bortolini, Marco ;
Faccio, Maurizio ;
Gamberi, Mauro ;
Pilati, Francesco .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 :348-367
[7]   A modified particle swarm optimization algorithm to mixed-model two-sided assembly line balancing [J].
Delice, Yilmaz ;
Aydogan, Emel Kizilkaya ;
Ozcan, Ugur ;
Ilkay, Mehmet Sitki .
JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (01) :23-36
[8]   Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation [J].
Dimitriadis, SG .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (09) :2757-2774
[9]   Packaging strategy definition for sales kits within an assembly system [J].
Faccio, Maurizio ;
Gamberi, Mauro ;
Pilati, Francesco ;
Bortolini, Marco .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (11) :3288-3305
[10]  
Kim YK, 1996, COMPUT IND ENG, V30, P397, DOI 10.1016/0360-8352(96)00009-5