共 50 条
- [36] Investigation of introducing water from an artificial recharge plant to an existing groundwater distribution system 4th World Water Congress: Innovation in Water Supply - Reuse and Efficiency, 2005, 5 (01): : 25 - 32
- [37] Two-Dimensional Modelling of Water Table Fluctuations due to Time-Varying Recharge from Rectangular Basin Water Resources Management, 1998, 12 : 467 - 475
- [38] Numerical modelling of physical clogging during groundwater artificial recharge CALIBRATION AND RELIABILITY IN GROUNDWATER MODELLING: MANAGING GROUNDWATER AND THE ENVIRONMENT, 2011, 341 : 121 - 126
- [39] Efficiency of Artificial Groundwater Recharge, Quantification Through Conceptual Modelling Water Resources Management, 2020, 34 : 3345 - 3361