Simulation of hydrological processes and effects of engineering projects on the Karkheh River Basin and its wetland using SWAT2009

被引:13
作者
Ghobadi, Yasser [1 ]
Pradhan, Biswajeet [1 ]
Sayyad, Gholam Abbas [2 ]
Kabiri, Keivan [3 ]
Falamarzi, Yashar [4 ]
机构
[1] Univ Putra Malaysia, Fac Engn, GISRC, Dept Civil Engn, Serdang 43400, Selangor, Malaysia
[2] Shahid Chamran Univ Ahwaz, Fac Agr, Dept Soil Sci, Ahvaz, Iran
[3] Iranian Natl Inst Oceanog & Atmospher Sci, Dept Satellite Oceanog, Tehran, Iran
[4] Univ Putra Malaysia, Fac Engn, Agr & Biol Engn Dept, Serdang 43400, Selangor, Malaysia
关键词
Simulation; SWAT model; SUFI-2; Uncertainty analysis; Engineering projects; KRB; WATER ASSESSMENT-TOOL; UNCERTAINTY ANALYSIS; LAND-USE; MODEL; IMPACTS; AVAILABILITY; VALIDATION; STREAMFLOW; RESOURCES; QUALITY;
D O I
10.1016/j.quaint.2015.02.034
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Limited water supply is one of the major restrictions in development and agricultural activities in numerous countries, especially in arid and semi-arid regions. Wetlands are constantly affected by anthropogenic factors such as engineering projects and landscaping. Therefore, simulation of hydrologic processes and modeling the factors involved are important. In this study, Soil and Water Assessment Tool (SWAT) was used to simulate the hydrologic process in the Karkheh River Basin (KRB) in southwest Iran and to evaluate the impacts of engineering projects on its wetland (Al Hawizeh) located in the Iran-Iraq border. Calibration, validation, and uncertainty analysis were performed using Sequential Uncertainty Fitting Ver. 2 (SUFI2), which is one of the program interfaces with SWAT, in the Package SWAT Calibration Uncertainty Programs (SWAT-CUP). To assess the goodness of calibration and validation, four measures were applied: (i) percentage of data bracketed by 95% prediction uncertainty or P-factor (95PPU) calculated at 2.5% and 97.5% intervals of the simulated variables, (ii) R-factor, which is the ratio of average thickness of the PPU, (iii) Nash-Sutcliffe coefficient (NSE), and (iv) determination of coefficient (R-2). Stream flows from four gauge stations combined with 14 synoptic stations were used for calibration (1987-1990) and validation (1991-1994). The P-factor values for these stations ranged from 0.64 to 0.84 and from 0.65 to 0.79 for calibration and validation, respectively. These results showed reasonable accuracy according to literature. NSE values were also acceptable, ranging from 0.52 to 0.8 and from 0.62 to 0.72 for calibration and validation, respectively. R-2 values were also within an acceptable range. The calibration and validation results were then used to simulate two watershed scenarios (with and without a dam). In addition, annual flow volumes (AFVs) for two downstream stations (Hamidiyeh and Pay e Pol) were computed. AFV is defined as the volume of water that discharges from catchment at the desired output during a year. The results showed that the flows during 1987-2000 (before dam construction) and 2001 to 2010 (after dam construction) were significantly reduced after the Karkheh dam construction. The corresponding AFVs for the Hamidiyeh and Pay e Pol stations were 8.92 x 10(11) and 1.04 x 10(12) m(3) in 1987-2000 and 2.57 x 10(11) to 3.94 x 10(11) m(3) in 2001-2010. Thus, the AFVs before and after dam construction were reduced to 6.34 x 10(11) and 6.53 x 10(11) m(3) for the Hamidiyeh and Pay e Pol gauges, respectively. Consequently, flow reduction affected the wetland area, in which the surface area of the wetland was reduced and dust emission was increased. (C) 2015 Elsevier Ltd and INQUA. All rights reserved.
引用
收藏
页码:144 / 153
页数:10
相关论文
共 52 条
[1]  
Abbaspour KC, 2007, MODSIM 2007: INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION, P1603
[2]  
Abbaspour K.C, 2013, SWAT-CUP 2012: SWAT calibration and uncertainty programs- A user manual
[3]   Modelling hydrology and water quality in the pre-alpine/alpine Thur watershed using SWAT [J].
Abbaspour, Karim C. ;
Yang, Jing ;
Maximov, Ivan ;
Siber, Rosi ;
Bogner, Konrad ;
Mieleitner, Johanna ;
Zobrist, Juerg ;
Srinivasan, Raghavan .
JOURNAL OF HYDROLOGY, 2007, 333 (2-4) :413-430
[4]  
Abbaspour KC, 2004, VADOSE ZONE J, V3, P1340
[5]  
Abbaspour KC, 2009, SWAT-CUP2: SWAT Calibration and Uncertainty Programs version 2 Manual
[6]   Mapping basin-level water productivity using remote sensing and secondary data in the Karkheh River Basin, Iran [J].
Ahmad, Mobin-ud-Din ;
Islam, Md. Aminul ;
Masih, Ilyas ;
Muthuwatta, Lal ;
Karimi, Poolad ;
Turral, Hugh .
WATER INTERNATIONAL, 2009, 34 (01) :119-133
[7]  
[Anonymous], MESOPOTAMIA 3 MILLEN
[8]  
Arnold JG, 2010, T ASABE, V53, P1433
[9]  
Arnold J.G., 2011, SOIL WATER ASSESSMEN
[10]   Large area hydrologic modeling and assessment - Part 1: Model development [J].
Arnold, JG ;
Srinivasan, R ;
Muttiah, RS ;
Williams, JR .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 1998, 34 (01) :73-89