Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy

被引:52
作者
El-Ferik, Sami [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Syst Engn, Dhahran 31261, Saudi Arabia
关键词
preventive maintenance; imperfect maintenance; lot-sizing; economic production quantity; integrated models;
D O I
10.1016/j.ejor.2007.01.035
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper is concerned with the joint determination of both economic production quantity and preventive maintenance (PM) schedules under the realistic assumption that the production facility is subject to random failure and the maintenance is imperfect. The manufacturing system is assumed to deteriorate while in operation, with an increasing failure rate. The system undergoes PM either upon failure or after having reached a predetermined age, whichever of them occurs first. As is often the case in real manufacturing applications, maintenance activities are imperfect and unable to restore the system to its original healthy state. In this work, we propose a model that could be used to determine the optimal number of production runs and the sequence of PM schedules that minimizes the long-term average cost. Some useful properties of the cost function are developed to characterize the optimal policy. An algorithm is also proposed to find the optimal solutions to the problem at hand. Numerical results are provided to illustrate both the use of the algorithm in the study of the optimal cost function and the latter's sensitivity to different changes in cost factors. (c) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:150 / 163
页数:14
相关论文
共 25 条
[1]   An integrated production and preventive maintenance planning model [J].
Aghezzaf, E. H. ;
Jamali, M. A. ;
Ait-Kadi, D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :679-685
[2]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[3]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[4]  
BENDAYA M, 2002, P IFRIM VAXJ SWED 6
[5]   Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment [J].
Dohi, T ;
Okamura, H ;
Osaki, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :147-155
[6]   Age-based hybrid model for imperfect preventive maintenance [J].
El-Ferik, S ;
Ben-Daya, M .
IIE TRANSACTIONS, 2006, 38 (04) :365-375
[7]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[8]  
Hariga M, 1998, NAV RES LOG, V45, P423, DOI 10.1002/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO
[9]  
2-7
[10]   Practices of preventive maintenance and replacement for engines: A case study [J].
Lai, KK ;
Leung, FKN ;
Tao, B ;
Wang, SY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (02) :294-306