Predictive Model-Based Process Start-Up in Pharmaceutical Continuous Granulation and Drying

被引:14
|
作者
Pauli, Victoria [1 ]
Kleinebudde, Peter [2 ]
Krumme, Markus [1 ]
机构
[1] Continuous Mfg CM Unit, Novartis Pharma AG, Novartis Campus, CH-4002 Basel, Switzerland
[2] Heinrich Heine Univ, Inst Pharmaceut & Biopharmaceut, Univ Str 1, D-40225 Dusseldorf, Germany
关键词
continuous manufacturing; process control; model-based control; start-up; shut-down; cost reduction; STRATEGY; BATCH;
D O I
10.3390/pharmaceutics12010067
中图分类号
R9 [药学];
学科分类号
1007 ;
摘要
Continuous manufacturing (CM) is a promising strategy to achieve various benefits in the context of quality, flexibility, safety and cost in pharmaceutical production. One of the main technical challenges of CM is that the process needs to handle transient conditions such as the start-up phase before state of control operation is reached, which can potentially cause out-of-specification (OOS) material. In this context, the presented paper aims to demonstrate that suitable process control strategies during start-up of a continuous granulation and drying operation can limit or even avoid OOS material production and hence can ensure that the provided benefits of CM are not compromised by poor production yields. In detail, heat-up of the drying chamber prior the start of production can lead to thermal energy being stored inside of the stainless-steel housing, acting as an energy buffer that is known to cause over-dried granules in the first few minutes of the drying process. To compensate this issue, an automatic ramping procedure of dryer rotation speed (and hence drying time) was introduced into the plant's process control system, which counteracts the excessive drying capacity during start-up. As a result, dry granules exiting the dryer complied with the targeted intermediate critical quality attribute loss-on-drying (LOD) from the very beginning of production.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] Model-based control of a granulation system
    Pottmann, M
    Ogunnaike, BA
    Adetayo, AA
    Ennis, BJ
    POWDER TECHNOLOGY, 2000, 108 (2-3) : 192 - 201
  • [32] Fast start-up of anammox process with mixed activated sludge and settling option
    Ye, Lihong
    Li, Dong
    Zhang, Jie
    Zeng, Huiping
    ENVIRONMENTAL TECHNOLOGY, 2018, 39 (23) : 3088 - 3095
  • [33] A Simple Scenario-based Qualitative Model for Assessing Start-up Risks
    Nordal, Y. Ayse B.
    FEMIB: PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON FINANCE, ECONOMICS, MANAGEMENT AND IT BUSINESS, 2020, : 98 - 105
  • [34] START-UP AS THE BUSINESS MODEL OF SUSTAINABLY DEVELOPED ENTERPRISE
    Jasinka-Biliczak, Anna
    12TH INTERNATIONAL SCIENTIFIC CONFERENCE BUSINESS AND MANAGEMENT 2022, 2022, : 224 - 230
  • [35] BUSINESS MODEL AND TEAM AS PRECONDITIONS OF A START-UP VIABILITY
    Slavik, Stefan
    Hagarova, Rachel
    Ljudvigova, Ivana
    Zagorsek, Branislav
    ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES, 2019, 6 (03): : 1404 - 1427
  • [36] The start-up of A/O biofilm process with silicon-based zeolite filter material
    Wang, Juan-ting
    Yu, Yan-zhen
    Zhao, You-heng
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 72 - 75
  • [37] Impact of the start-up process on the microbial communities in biocathodes for electrosynthesis
    Mateos, Raul
    Sotres, Ana
    Alonso, Raul M.
    Escapa, Adrian
    Moran, Antonio
    BIOELECTROCHEMISTRY, 2018, 121 : 27 - 37
  • [38] Designing Business Incubator Model for Start-up Digital
    Amelia, Tifa Noer
    Thoyib, Armanu
    Irianto, Gugus
    Rofiq, Ainur
    PROCEEDINGS OF 2018 9TH INTERNATIONAL CONFERENCE ON E-BUSINESS, MANAGEMENT AND ECONOMICS (ICEME 2018), 2018, : 91 - 95
  • [39] Effects of dispense equipment sequence on process start-up defects
    Brakensiek, Nick
    Sevegney, Michael
    ADVANCES IN RESIST MATERIALS AND PROCESSING TECHNOLOGY XXX, 2013, 8682
  • [40] The nature of business model innovation in start-up companies
    Milei, Pavel
    INTERNATIONAL JOURNAL OF ENTREPRENEURIAL VENTURING, 2022, 14 (01) : 1 - 15