Assessing human resource management in construction projects in Kuwait

被引:10
作者
El-Dash, Karim [1 ]
机构
[1] Coll Technol Studies, Shuwaikh 70654, Kuwait
关键词
assessment; construction; human resources; project management;
D O I
10.3130/jaabe.6.65
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In developing countries, a general lack of experience exists in construction management implementation. This study introduces a methodology to evaluate human resource management processes in construction projects. The study used inputs, outputs, and tools and techniques recommended by the Guide to the Project Management Body of Knowledge (PMBOK, 2004). The opinions of experts in the field of construction projects were collected regarding the managerial parameters and tools of interest. The analytic hierarchy process was used to evaluate the ranking of each parameter. The performance of each process was determined based on the importance weighting and the proposed efficiency of each variable. The results of the implementation showed considerable progress in project planning, but team development and team management need much more attention. The study presents a methodology for human resource assessment in the construction industry and the findings are applicable to Kuwait and similar developing countries.
引用
收藏
页码:65 / 71
页数:7
相关论文
共 10 条
[1]   Estimating labor production rates for industrial construction activities [J].
AbouRizk, S ;
Knowles, P ;
Hermann, UR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06) :502-511
[2]   US construction labor productivity trends, 1970-1998 [J].
Allmon, E ;
Haas, CT ;
Borcherding, JD ;
Goodrum, PM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02) :97-104
[3]   Impact of labor factors on workflow [J].
Lee, HS ;
Yu, JH ;
Kim, SK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06) :918-923
[4]  
Loosemore M., 2003, Human Resource Management in Construction Projects
[5]   Labor-management cooperation and customer satisfaction [J].
Maloney, WF .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (02) :165-172
[6]  
Project Management Institute (PMI), 2021, GUID PROJ MAN BOD KN
[7]  
Saaty TL., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
[8]   Construction baseline productivity: Theory and practice [J].
Thomas, HR ;
Zavrski, I .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (05) :295-303
[9]   Symbiotic crew relationships and labor flow [J].
Thomas, HR ;
Horman, MJ ;
de Souza, UEL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06) :908-917
[10]   Improving labor flow reliability for better productivity as lean construction principle [J].
Thomas, HR ;
Horman, MJ ;
Minchin, RE ;
Chen, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (03) :251-261