An Improved Multiobjective Memetic Algorithm for Permutation Flow Shop Scheduling

被引:0
作者
Chiang, Tsung-Che [1 ]
Fu, Li-Chen [2 ]
机构
[1] Natl Taiwan Normal Univ, Dept Comp Sci & Informat Engn, Taipei, Taiwan
[2] Natl Taiwan Univ, Dept Elect Engn, Dept Comp Sci & Informat Engn, Taipei, Taiwan
来源
2010 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC) | 2010年
关键词
GENETIC LOCAL SEARCH; EVOLUTIONARY ALGORITHMS; HEURISTICS; MAKESPAN; MINIMIZE; JOBS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper addresses a multiobjective scheduling problem in the permutation flow shop. The objectives are to minimize makespan and total flow time. The proposed approach is based on the framework of memetic algorithm, which is known as a hybrid of genetic algorithm and local search. The local search procedure is an iterative process repeating neighbor generation, neighbor evaluation, and neighbor selection. We take a problem-specific heuristic for neighbor generation and propose several strategies for neighbor evaluation and neighbor selection. Archive injection (adding non-dominated solutions to the population) is another issue under investigation. We examine the effects of the proposed strategies through experiments using forty widely used problem instances with different scales. We also evaluate the proposed approach by comparing it with other twenty-six ones in terms of three performance metrics. Our approach outperforms all benchmarks and updates a large portion of the sets of best known non-dominated solutions for large-scale instances.
引用
收藏
页数:8
相关论文
共 36 条
[1]  
[Anonymous], 2007, EVOLUTIONARY ALGORIT
[2]  
[Anonymous], 2001, 103 TIK ETH COMP ENG
[3]  
[Anonymous], 214 TIK ETH COMP ENG
[4]   Genetic local search for multi-objective flowshop scheduling problems [J].
Arroyo, JEC ;
Armentano, VA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) :717-738
[5]   Hybrid genetic algorithms for a multiple-objective scheduling problem [J].
Cavalieri, S ;
Gaiardelli, P .
JOURNAL OF INTELLIGENT MANUFACTURING, 1998, 9 (04) :361-367
[6]   The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem [J].
Chang, PC ;
Hsieh, JC ;
Lin, SG .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (03) :171-183
[7]   Sub-population genetic algorithm with mining gene structures for multiobjective flowshop scheduling problems [J].
Chang, Pei-Chann ;
Chen, Shih-Hsin ;
Liu, Chen-Hao .
EXPERT SYSTEMS WITH APPLICATIONS, 2007, 33 (03) :762-771
[8]  
Chiang TC, 2009, LECT NOTES COMPUT SC, V5754, P813, DOI 10.1007/978-3-642-04070-2_87
[9]  
Corne D. W., 2001 P GECCO, P283
[10]  
Dahal KP, 2007, STUD COMPUT INTELL, V49, P1, DOI 10.1007/978-3-540-48584-1