Optimized Preventive Maintenance Strategies for Corroded Bridge Columns in Earthquake-Prone Regions

被引:2
作者
Katikala, Sairam [1 ]
Banerjee, Swagata [1 ]
Arora, Raj Kamal [1 ]
机构
[1] Indian Inst Technol, Dept Civil Engn, Mumbai 400076, Maharashtra, India
关键词
Preventive maintenance (PM); Corroded bridge column; Seismic risk; Optimization; Fiber-reinforced polymer (FRP); Cathodic protection (CP); LIFE-CYCLE MAINTENANCE; MULTIOBJECTIVE OPTIMIZATION; CONCRETE; RISK; RELIABILITY; PERFORMANCE; MANAGEMENT; SELECTION; TOPOLOGY; REPAIR;
D O I
10.1061/(ASCE)SC.1943-5576.0000709
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Applying preventive maintenance (PM) strategies to corroded concrete bridge columns along their life spans is essential to reduce sudden loss in bridge functionality during earthquakes and associated risk owing to postearthquake damage. This study identifies optimized applications of condition-based PM for bridge columns with an objective to minimize seismic risk and life-cycle cost (LCC) for applying maintenance interventions. External wrapping of columns with fiber-reinforced polymer (FRP) composites and application of cathodic protection (CP) technique were used as maintenance actions. These maintenance actions were applied in four sequence-oriented strategies, namely simultaneous, FRP followed by CP, CP followed by FRP, and FRP only, to explore the benefit of different application sequences involving FRP and CP. Multiobjective optimization using the Nondominated Sorting Genetic Algorithm-II (NSGA-II) was performed for this purpose. Numerical analyses with a model column identified diverse pools of near-optimal solutions with different FRP materials (i.e., carbon and glass), their number of layers, and time of application of FRP and CP. When comparing solutions from different strategies, it was observed that earlier application of FRP was advantageous to keep the expected seismic risk of the column at a lower level for a longer duration of its design life. (C) 2022 American Society of Civil Engineers.
引用
收藏
页数:14
相关论文
共 54 条
[1]  
AASHTO, 2007, Maintenance manual for roadways and bridges
[2]   Fiber-Reinforced Polymer Pile Repair Incorporating Cathodic Protection [J].
Aguilar, Julio ;
Winters, Danny ;
Sen, Rajan ;
Mullins, Gray ;
Stokes, Mike .
TRANSPORTATION RESEARCH RECORD, 2010, (2150) :111-118
[3]  
[Anonymous], 1998, FHWARD98088 FHWA
[4]  
[Anonymous], 1997, Report No. SAC/BD-97/04
[5]  
[Anonymous], 2003, NIBS 2003 MULT LOSS
[6]  
Bailey D.M., 2013, ERDCCERLTR136 IL ENG
[7]   Optimal FRP-strengthening strategy for corrosion-affected reinforced concrete columns [J].
Baji, Hassan ;
Yang, Wei ;
Li, Chun-Qing .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2018, 14 (12) :1586-1597
[8]   Multihazard resilience of highway bridges and bridge networks: a review [J].
Banerjee, Swagata ;
Vishwanath, B. Sharanbaswa ;
Devendiran, Dinesh Kumar .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (12) :1694-1714
[9]   Life-cycle maintenance of deteriorating structures by multi-objective optimization involving reliability, risk, availability, hazard and cost [J].
Barone, Giorgio ;
Frangopol, Dan M. .
STRUCTURAL SAFETY, 2014, 48 :40-50
[10]   Optimization of Life-Cycle Maintenance of Deteriorating Bridges with Respect to Expected Annual System Failure Rate and Expected Cumulative Cost [J].
Barone, Giorgio ;
Frangopol, Dan M. ;
Soliman, Mohamed .
JOURNAL OF STRUCTURAL ENGINEERING, 2014, 140 (02)