A Comparison of Shewhart-Type Time-Between-Events Control Charts Based on the Renewal Process

被引:6
作者
Ali, Sajid [1 ]
Shah, Ismail [1 ]
Wang, Lichen [2 ]
Yue, Zhen [2 ]
机构
[1] Quaid I Azam Univ, Dept Stat, Islamabad 45320, Pakistan
[2] Linyi Univ, Coll Life Sci, Linyi 276000, Shandong, Peoples R China
关键词
Germanium; Shape; Control charts; Exponential distribution; Process control; Monitoring; Weibull distribution; Average run length; continuous rank probability score; expected quadratic loss; generalized exponential distribution; high quality process; Relative average run length; SCORING RULES; AVERAGE TIME; WEIBULL; QUALITY; DESIGN; DISTRIBUTIONS; PREDICTION;
D O I
10.1109/ACCESS.2020.3003265
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To study the high quality processes, time-between-events (TBE) control charts have several advantages over the ordinary control charts. However, the existing TBE charts are based on the exponential distribution, which limit the application of these charts to monitor rare events. Therefore, to generalize existing exponential TBE charts, recently two new TBE charts assuming Weibull and generalized exponential distributions for the inter-arrival times of the renewal process, have been proposed in the literature. The main aim of this study is to present a detailed comparison of these charts. We use the expected quadratic loss (EQL), relative average run length (RARL), continuous rank probability score (CRPS) and closeness measure to assess the performance of the Weibull and the generalized exponential charts. We also discuss four real data examples in this article.
引用
收藏
页码:113683 / 113701
页数:19
相关论文
共 42 条
[1]   Monitoring of time between events with a double generally weighted moving average control chart [J].
Alevizakos, Vasileios ;
Koukouvinos, Christos ;
Lappa, Angeliki .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2019, 35 (02) :685-710
[2]   Monitoring Regularly Maintained Systems Based on the Renewal Process with Generalized Exponential Distribution of Time between Events [J].
Ali, Sajid ;
Shah, Ismail .
JOURNAL OF TESTING AND EVALUATION, 2020, 48 (05) :3673-3694
[5]   Time and magnitude monitoring based on the renewal reward process [J].
Ali, Sajid ;
Pievatolo, Antonio .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 179 :97-107
[7]   An Overview of Control Charts for High-quality Processes [J].
Ali, Sajid ;
Pievatolo, Antonio ;
Goeb, Rainer .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2016, 32 (07) :2171-2189
[8]   High quality process monitoring using a class of inter-arrival time distributions of the renewal process [J].
Ali, Sajid ;
Pievatolo, Antonio .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 :45-62
[9]   Comparing the Effectiveness of Different Reinforcement Stimuli in a Robotic Therapy for Children With ASD [J].
Ali, Sara ;
Mehmood, Faisal ;
Ayaz, Yasar ;
Khan, Muhammad Jawad ;
Sadia, Haleema ;
Nawaz, Raheel .
IEEE ACCESS, 2020, 8 :13128-13137
[10]   Monitoring schedule time using exponentially modified Gaussian distribution [J].
Ara, Jehan ;
Ali, Sajid ;
Shah, Ismail .
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2020, 17 (04) :448-469