A framework for production rescheduling in sociotechnical manufacturing environments

被引:13
作者
Arica, Emrah [1 ]
Haskins, Cecilia [1 ]
Strandhagen, Jan O. [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Prod & Qual Engn, NTNU, Trondheim, Norway
关键词
Decision-making; rescheduling; production planning and control; case study; uncertainty; DECISION-SUPPORT; SYSTEMS; ISSUES; IMPLEMENTATION; OPPORTUNITIES; COORDINATION; UNCERTAINTY; INFORMATION; TASKS;
D O I
10.1080/09537287.2016.1193910
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
No plan survives contact with reality. Despite the rich research base regarding handling uncertainty in production planning and control systems, there is an intellectual gap between theory and practice with regard to handling unforeseen events generated by internal and external factors, such as unforeseen machine downtimes and changes in demand. Motivated by longitudinal observations in two industrial settings and an analysis of the relevant literature, a framework for rescheduling decision-making in the face of unforeseen production events is proposed. In practical settings, the effectiveness of decisions depends on a set of situational factors. The findings of this research can be utilised further to provide guidelines for developing effective decision support principles and systems, addressing the needs of organisational decision-makers.
引用
收藏
页码:1191 / 1205
页数:15
相关论文
共 55 条
[1]  
[Anonymous], PLANNING INTELLIGENT
[2]   Executing production schedules in the face of uncertainties: A review and some future directions [J].
Aytug, H ;
Lawley, MA ;
McKay, K ;
Mohan, S ;
Uzsoy, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) :86-110
[3]   Human, technological and organizational aspects influencing the production scheduling process [J].
Berglund, M. ;
Karltun, J. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 110 (1-2) :160-174
[4]  
Bertrand J W., 1990, Production control: a structural and design oriented approach
[5]   Implementing finite capacity production scheduling: lessons from a practical case [J].
Carvalho, Andrea N. ;
Scavarda, Luiz Felipe ;
Lustosa, Leonardo J. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (04) :1215-1230
[6]   Using real time information for effective dynamic scheduling [J].
Cowling, P ;
Johansson, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (02) :230-244
[7]  
Crawford S., 2001, Human performance in planning and scheduling, P15
[8]  
Crawford SC, 1999, AGENDA, V37, P63
[9]   Coordination activities of human planners during rescheduling: case analysis and event handling procedure [J].
de Snoo, C. ;
van Wezel, W. ;
Wortmann, J. C. ;
Gaalman, G. J. C. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (07) :2101-2122
[10]   Coordination and Task Interdependence during Schedule Adaptation [J].
de Snoo, Cees ;
van Wezel, Wout .
HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING & SERVICE INDUSTRIES, 2014, 24 (02) :139-151