Probabilistic model and analysis of coupled train-ballasted track-subgrade system with uncertain structural parameters

被引:13
作者
Mao, Jian-feng [1 ,2 ,3 ]
Xiao, Yuan-jie [1 ,2 ,3 ]
Yu, Zhi-wu [1 ,2 ,3 ]
Tutumluer, Erol [1 ,2 ,3 ,4 ]
Zhu, Zhi-hui [1 ,2 ,3 ]
机构
[1] Cent South Univ, Sch Civil Engn, Changsha 410075, Peoples R China
[2] Natl Engn Lab High Speed Railway Construct, Changsha 410075, Peoples R China
[3] Cent South Univ, Minist Educ, Key Lab Engn Struct Heavy Haul Railway, Changsha 410075, Peoples R China
[4] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
基金
中国国家自然科学基金;
关键词
coupled train-ballast-subgrade system; structural parameter uncertainty; stochastic dynamic analysis; probability density evolution method; wheel-rail interaction; DYNAMIC-ANALYSIS; BRIDGE;
D O I
10.1007/s11771-021-4765-z
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Random dynamic responses caused by the uncertainty of structural parameters of the coupled train-ballasted track-subgrade system under train loading can pose safety concerns to the train operation. This paper introduced a computational model for analyzing probabilistic dynamic responses of three-dimensional (3D) coupled train-ballasted track-subgrade system (TBTSS), where the coupling effects of uncertain rail irregularities, stiffness and damping properties of ballast and subgrade layers were simultaneously considered. The number theoretical method (NTM) was employed to design discrete points for the multi-dimensional stochastic parameters. The time-histories of stochastic dynamic vibrations of the TBSS with systematically uncertain structural parameters were calculated accurately and efficiently by employing the probability density evolution method (PDEM). The model-predicted results were consistent with those by the Monte Carlo simulation method. A sensitivity study was performed to assess the relative importance of those uncertain structural parameters, based on which a case study was presented to explore the stochastic probability evolution mechanism of such train-ballasted track-subgrade system.
引用
收藏
页码:2238 / 2256
页数:19
相关论文
共 45 条
[31]   Uncertainty and sensitivity analysis for train-ballasted track-bridge system [J].
Xin, Lifeng ;
Li, Xiaozhen ;
Zhu, Yan ;
Liu, Ming .
VEHICLE SYSTEM DYNAMICS, 2020, 58 (03) :453-471
[32]   Vehicle-track interaction with consideration of rail irregularities at three-dimensional space [J].
Xu, Lei ;
Zhang, Qiang ;
Yu, Zhiwu ;
Zhu, Zhihui .
JOURNAL OF VIBRATION AND CONTROL, 2020, 26 (15-16) :1228-1240
[33]   Probabilistic assessment of railway vehicle-curved track systems considering track random irregularities [J].
Xu, Lei ;
Zhai, Wanming .
VEHICLE SYSTEM DYNAMICS, 2018, 56 (10) :1552-1576
[34]   A new model for temporal-spatial stochastic analysis of vehicle-track coupled systems [J].
Xu, Lei ;
Zhai, Wanming .
VEHICLE SYSTEM DYNAMICS, 2017, 55 (03) :427-448
[35]  
Yang YB., 2004, VEHICLE BRIDGE INTER, DOI [10.1142/5541, DOI 10.1142/5541]
[36]   A stochastic dynamic model of train-track-bridge coupled system based on probability density evolution method [J].
Yu, Zhi-wu ;
Mao, Jian-feng .
APPLIED MATHEMATICAL MODELLING, 2018, 59 :205-232
[37]   Probability analysis of train-track-bridge interactions using a random wheel/rail contact model [J].
Yu, Zhi-wu ;
Mao, Jian-feng .
ENGINEERING STRUCTURES, 2017, 144 :120-138
[38]   Non-stationary random vibration analysis of a 3D train-bridge system using the probability density evolution method [J].
Yu, Zhi-wu ;
Mao, Jian-feng ;
Guo, Feng-qi ;
Guo, Wei .
JOURNAL OF SOUND AND VIBRATION, 2016, 366 :173-189
[39]  
Zakeri JA, 2009, LAT AM J SOLIDS STRU, V6, P89
[40]  
Zeng Q. Y., 1999, TRAIN BRIDGE TIME VA