共 50 条
- [1] DSM-based Complex Aerospace Projects Development Process Design and Optimization 2015 9TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2015, : 409 - 415
- [3] Study on Plant-Wide Optimization Based on Interval Number for Gold Hydrometallurgical Process PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 846 - 850
- [4] Products Development Process Based on DSM and Its Optimization 2009 INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, VOL III, 2009, : 689 - 692
- [5] Optimization Retrieval for Manufacturing Resources Based on Interval Number AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 349 - 352
- [6] Information Flow Optimization in Construction Design Projects Based on DSM 2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 1994 - +
- [7] DSM BASED APPROACH FOR MANAGING REQUIREMENTS, RULES AND DESIGN PARAMETERS IN KNOWLEDGE BASED DESIGN PROCESS MANAGING COMPLEXITY BY MODELLING DEPENDENCIES, 2010, : 237 - 240
- [9] Study on Process Modelling and Optimizing Based on Interval Number for Gold Hydrometallurgy Zidonghua Xuebao/Acta Automatica Sinica, 2019, 45 (05): : 927 - 940