Optimization Analysis Of Project Design Process Based On Interval Number DSM

被引:0
|
作者
Ding, Jianfeng [1 ]
Xu, Haiyan [1 ]
Peng, Yuming [2 ]
Li, Shuyi [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Econ & Management, Nanjing, Jiangsu, Peoples R China
[2] Nanjing Univ Aeronaut & Astronaut, Coll Sci, Nanjing, Peoples R China
来源
2014 11TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM) | 2014年
关键词
DSM; project management; interval number; information dependency matrix; sort optimization;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
As a modeling and analysis tool of project management, design structure matrix (DSM) can support the decomposition and integration of design programs with simple and vivid description method through analyzing information contact among tasks. However, in actual process of project management, it is difficult for manager to grasp the information connection among design tasks accurately. It belongs to the problem of uncertain information. For such problem, this paper presents a sorting algorithm to optimize the project design process based on interval number design structure matrix (INDSM). First, establish the interval number design structure matrix model and design the general optimization algorithm of it through partitioning, coupling and decoupling operations. Then this paper builds a feedback evaluation function to verify the effectiveness of optimization model. The designed optimization algorithm of interval number DSM is used to analyze the process of one aircraft development project. This model takes the situation of uncertain information into consideration, overcomes the limitation to data in traditional method, and can describe actual situation more reasonable. Calculating example shows that the designed optimization algorithm can reduce the feedback of project process, make the execution of tasks more smoothly and information connection in project more reasonable, thus reducing the risk of project.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] DSM-based Complex Aerospace Projects Development Process Design and Optimization
    Xiong, Weitao
    Liu, Can
    Zhao, Qingsong
    Yang, Kewei
    2015 9TH ANNUAL IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2015, : 409 - 415
  • [2] Research on Optimization of Project Design Management Process Based on BIM
    Jiao, Yuanhang
    Cao, Ping
    BUILDINGS, 2023, 13 (09)
  • [3] Study on Plant-Wide Optimization Based on Interval Number for Gold Hydrometallurgical Process
    Liu, Yadong
    Chang, Yuqing
    Niu, Dapeng
    Wang, Fuli
    PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 846 - 850
  • [4] Products Development Process Based on DSM and Its Optimization
    Feng Tao
    Chen Bing
    Zhang Dinghua
    Li Shan
    2009 INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, VOL III, 2009, : 689 - 692
  • [5] Optimization Retrieval for Manufacturing Resources Based on Interval Number
    Zhao Zhong-min
    Peng An-hua
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 349 - 352
  • [6] Information Flow Optimization in Construction Design Projects Based on DSM
    Cai Yi-ping
    Peng Zheng-guang
    You Jian-xin
    2009 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (16TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2009, : 1994 - +
  • [7] DSM BASED APPROACH FOR MANAGING REQUIREMENTS, RULES AND DESIGN PARAMETERS IN KNOWLEDGE BASED DESIGN PROCESS
    Bhaskara, Sreeram
    MANAGING COMPLEXITY BY MODELLING DEPENDENCIES, 2010, : 237 - 240
  • [8] Plant-wide optimization based on interval number for beneficiation and metallurgy
    Yuan, Qingyun
    Liu, Tan
    Wang, Yonggang
    Wang, Lina
    CANADIAN JOURNAL OF CHEMICAL ENGINEERING, 2021, 99 (S1) : S485 - S503
  • [9] Study on Process Modelling and Optimizing Based on Interval Number for Gold Hydrometallurgy
    Liu Y.-D.
    Niu D.-P.
    Chang Y.-Q.
    Wang F.-L.
    Zhang Y.-J.
    Zidonghua Xuebao/Acta Automatica Sinica, 2019, 45 (05): : 927 - 940
  • [10] Venture capital project selection based on interval number grey target decision model
    Fu, Sha
    Xiao, Ye-zhi
    Zhou, Hang-jun
    Liu, Sheng-zong
    SOFT COMPUTING, 2021, 25 (06) : 4865 - 4874