In this paper, we address a two-machine flow shop scheduling problem under simple linear deterioration. By a simple linear deterioration function, we mean that the processing time of a job is a simple linear function of its execution start time. The objective is to find a sequence that minimizes total weighted completion time. Optimal schedules are obtained for some special cases. For the general case, several dominance properties and two lower bounds are derived to speed up the elimination process of a branch-and-bound algorithm. A heuristic algorithm is also proposed to overcome the inefficiency of the branch-and-bound algorithm. Computational analysis on randomly generated problems is conducted to evaluate the branch-and-bound algorithm and heuristic algorithm. (C) 2010 Elsevier Inc. All rights reserved.
机构:
Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R ChinaShenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China
Wang, Ji-Bo
Ji, P.
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Ind & Syst Engn, Kowloon, Hong Kong, Peoples R ChinaShenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China
Ji, P.
Cheng, T. C. E.
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R ChinaShenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China
Cheng, T. C. E.
Wang, Dan
论文数: 0引用数: 0
h-index: 0
机构:
Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R ChinaShenyang Aerosp Univ, Sch Sci, Shenyang 110136, Peoples R China