Rongjiang Bridge: The Longest Bridge of Rigid Girder and Flexible Arch

被引:1
作者
Sheng, Xingwang [1 ]
Zheng, Weiqi [1 ]
Dai, Jin [1 ]
He, Ting [2 ]
机构
[1] Cent South Univ, Sch Civil Engn, Changsha, Hunan, Peoples R China
[2] Hunan Prov Commun Planning Survey & Design Inst C, Changsha, Hunan, Peoples R China
关键词
high-speed railway bridge; rigid girder and flexible arch; integral gusset plate; multi-scale finite element model; dynamic response; vehicle-bridge system; HIGH-SPEED RAILWAY; BOX-GIRDER; CONSTRUCTION; DESIGN;
D O I
10.1080/10168664.2019.1681345
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridges of rigid girder and flexible arch have been widely used in the construction of high-speed railways in the last several decades. This bridge type is adopted for Rongjiang Bridge in Xiamen-Shenzhen railway. The main span of Rongjiang Bridge is 220 m, and it is the longest bridge of rigid girder and flexible arch in the world at present. The main structural design criteria and details of Rongjiang Bridge are introduced in this work, and the case features of this bridge are highlighted. Besides, some key issues associated with the structural design are researched, including the mechanical property of integral gusset plate, modal analysis and dynamic response of vehicle-bridge system. The multi-scale finite element modeling technique is recommended for analysis of the complex substructures, and the operating conditions of the vehicle-bridge system can be better evaluated by the co-simulation technology of multi-body dynamics and finite element method. Finally, a brief account of the construction method of this bridge type is reviewed.
引用
收藏
页码:65 / 71
页数:7
相关论文
共 11 条
  • [1] Chen B., 2011, J Civ Eng Architect, V9, P799
  • [2] New Songhua River Bridge: A Continuous Girder, Tied Arch, Hybrid Bridge with Four Rail Tracks in Harbin, China
    Dai, Gonglian
    Su, Miao
    Liu, Wenshuo
    Chen, Y. Frank
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2016, 26 (03) : 254 - 259
  • [3] Recent developments of high-speed railway bridges in China
    He, Xuhui
    Wu, Teng
    Zou, Yunfeng
    Chen, Y. Frank
    Guo, Hui
    Yu, Zhiwu
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2017, 13 (12) : 1584 - 1595
  • [4] Design, Analysis and Construction of a Steel Truss Cable-Stayed Bridge for High-Speed Railway in China
    He, Xuhui
    Qin, Hongxi
    Liu, Wenshuo
    Chen, Y. Frank
    Zhai, Jianping
    Yu, Lang
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2016, 26 (04) : 381 - 388
  • [5] The Second Wuhu Bridge: An Industrialized Application of External Pre-stressed Box-Girder Bridge in China
    Hu, Ke
    Shi, Xuefei
    Ruan, Xin
    Liang, Changhai
    Liu, Zhiquan
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2017, 27 (02) : 315 - 320
  • [6] Dongping Channel Bridge: Long-Span Steel Arch Bridge in High-Speed Railway, China
    Liu, Wenshuo
    Dai, Gonglian
    [J]. STRUCTURAL ENGINEERING INTERNATIONAL, 2011, 21 (04) : 492 - 496
  • [7] The PRC Ministry of Railways, 2004, COD RAT EX RAILW BRI
  • [8] Accurate Stress Analysis on Steel Box Girder of Long Span Suspension Bridges Based on Multi-Scale Submodeling Method
    Wang, Hao
    Li, Aiqun
    Hu, Ruomei
    Li, Jian
    [J]. ADVANCES IN STRUCTURAL ENGINEERING, 2010, 13 (04) : 727 - 740
  • [9] Dynamic analysis of railway bridge under high-speed trains
    Xia, H
    Zhang, N
    [J]. COMPUTERS & STRUCTURES, 2005, 83 (23-24) : 1891 - 1901
  • [10] Recent development of design and construction of short span high-speed railway bridges in China
    Yan, Bin
    Dai, Gong-Lian
    Hu, Nan
    [J]. ENGINEERING STRUCTURES, 2015, 100 : 707 - 717