The Role of the Interface and Interface Management in the Optimization of BIM Multi-Model Applications: A Review

被引:9
作者
Hmidah, Nawal Abdunasseer [1 ]
Haron, Nuzul Azam [1 ]
Alias, Aidi Hizami [1 ]
Law, Teik Hua [1 ]
Altohami, Abubaker Basheer Abdalwhab [1 ]
Effendi, Raja Ahmad Azmeer Raja Ahmad [2 ]
机构
[1] Univ Putra Malaysia UPM, Fac Engn, Dept Civil Engn, Serdang 43400, Malaysia
[2] Univ Putra Malaysia UPM, Fac Design & Architecture, Dept Ind Design, Serdang 43400, Malaysia
关键词
BIM; management interface; BIM multi-model; BIM-BMS system; optimization; SITE LAYOUT; INTEGRATED APPROACH; CONSTRUCTION; MODEL; ALGORITHM; ADOPTION; SUPPORT; PROJECT; GENERATION; BUILDINGS;
D O I
10.3390/su14031869
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This review targets the BIM interface, the BIM multi-model approach, and the role of employing algorithms in BIM optimization to introduce the need for automation in the BIM technique, instead of complicating manual procedures in order to reduce possible errors. The challenge with adopting BIM lies in the limiting ability of computer-aided design (CAD) to generate a read-able and straightforward Revit by BIM, requiring the homogeneous data format to be generalized better and maintain a super data mod. Furthermore, the communication and management inter-face (CMI) faces some shortcomings due to limitations in its ability to recognize the role of the interface during the project construction phase. This review demonstrates several proposals to simplify the interface, in order to facilitate better communication amongst participants. The industry foundation class (IFC) model requires a new technique to unlock the potential future of intelligent buildings using the BIM multi-model approach integrated with the Internet of Things (IoT). Trials conducted to enhance the BIM model lack advanced methods for optimizing cost, energy consumption, labor, material movement, and the size of layout of the project, by utilizing heuristic, metaheuristic, and k-mean algorithms. The enhancement of BIM could involve algorithms to achieve better productivity, safety, cost, time, and construction frameworks. The review shows that some gaps and limitations still exist, especially considering the potential link between BIM and building management system (BMS) and the level of influence of the BIM-IoT prototype. Future work should find the best approach to solve facility management within the dynamic model, which is still under investigation.
引用
收藏
页数:29
相关论文
共 126 条
[1]   Java']JavaScript Object Notation (JSON']JSON) data serialization for IFC schema in web-based BIM data exchange [J].
Afsari, Kereshmeh ;
Eastman, Charles M. ;
Castro-Lacouture, Daniel .
AUTOMATION IN CONSTRUCTION, 2017, 77 :24-51
[2]  
Ahuja Ritu, 2017, International Journal of Sustainable Built Environment, V6, P69, DOI 10.1016/j.ijsbe.2016.10.006
[3]   Auto-generated site layout: an integrated approach to real-time sensing of temporary facilities in infrastructure projects [J].
Akanmu, Abiola ;
Olatunji, Oluwole ;
Love, Peter E. D. ;
Duy Nguyen ;
Matthews, Jane .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2016, 12 (10) :1243-1255
[4]  
Alahmad M., P IECON 2010 36 ANN, P2454
[5]  
Alba E, 2008, LECT NOTES COMPUT SC, V4974, P1
[6]   Towards a conceptual framework to manage BIM/COBie asset data using a standard project management methodology [J].
Alnaggar, Ahmed ;
Pitt, Michael .
JOURNAL OF FACILITIES MANAGEMENT, 2019, 17 (02) :175-187
[7]  
Alshehri F., P CITA BIM GATH 2017
[8]   Investigating Approaches of Integrating BIM, IoT, and Facility Management for Renovating Existing Buildings: A Review [J].
Altohami, Abubaker Basheer Abdalwhab ;
Haron, Nuzul Azam ;
Alias, Aidi Hizami Ales ;
Law, Teik Hua .
SUSTAINABILITY, 2021, 13 (07)
[9]   BIM-based Applications of Metaheuristic Algorithms to Support the Decision-making Process: Uses in the Planning of Construction Site Layout [J].
Amiri, Roya ;
Sardroud, Javad Majrouhi ;
de Soto, Borja Garcia .
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 :558-564
[10]  
[Anonymous], 2014, ADM ISSUES J CONNECT, DOI DOI 10.5929/2014.4.2.9