RESEARCH ON RESOURCE LEVELING PROBLEM UNDER RESOURCE CONSTRAINED CONDITION

被引:2
|
作者
Wang, Qiang [1 ]
Qi, Jian-Xun [1 ]
机构
[1] N China Elect Power Univ, Dept Business Management, Beijing 102206, Peoples R China
关键词
RCP scheduling problem; Resource leveling problem; Particle swarm optimization; Project management; Heuristic methods; Project scheduling; PROJECT; SEARCH;
D O I
10.1109/ICMLC.2009.5212393
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a new problem is defined according to the actual project requirement. It is resource leveling problem under resource constrained condition. Unlike the single resource leveling problem, or the resource constrained scheduling problem, this new problem will consider not only resource usage evenness, but also the shortest project duration under resource constrained condition. A new objective function is designed and a particle swarm optimization (PSO) algorithm is presented to solve this problem.
引用
收藏
页码:901 / 906
页数:6
相关论文
共 50 条
  • [41] Evolving heuristics for the resource constrained project scheduling problem with dynamic resource disruptions
    Chand, Shelvin
    Singh, Hemant
    Ray, Tapabrata
    SWARM AND EVOLUTIONARY COMPUTATION, 2019, 44 : 897 - 912
  • [42] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [43] Optimal resource leveling of multi-resource projects
    Younis, MA
    Saad, B
    COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) : 1 - 4
  • [44] Optimal resource leveling of multi-resource projects
    American Univ of Cairo, Cairo, Egypt
    Computers and Industrial Engineering, 1996, 31 (1-2): : 1 - 4
  • [45] Proposing new clustering-based algorithms for the multi-skilled resource-constrained multi-project scheduling problem with resource leveling adjustments
    Goudarzi, Ehsan
    Esmaeeli, Hamid
    Parsa, Kia
    Asadzadeh, Shervin
    KYBERNETES, 2025, 54 (02) : 1049 - 1081
  • [46] Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects
    Menesi, Wail
    Hegazy, Tarek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [47] PREEMPTIVE RESOURCE LEVELING IN PROJECTS
    Li, Hongbo
    Hu, Ziyi
    Zhu, Hanyu
    Liu, Yinbin
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2021, 55 (04): : 51 - 68
  • [48] RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
    EASA, SM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (02): : 302 - 316
  • [49] Resource leveling in a machine environment
    Marton Drotos
    Kis, Tamas
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 212 (01) : 12 - 21
  • [50] Exact Solution of Resource Leveling Problem by Exhaustive Enumeration with Parallel Programming
    Erzurum, Tuğba
    Bettemır, Önder Halis
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2021, 32 (03): : 10767 - 10805