RESEARCH ON RESOURCE LEVELING PROBLEM UNDER RESOURCE CONSTRAINED CONDITION

被引:2
|
作者
Wang, Qiang [1 ]
Qi, Jian-Xun [1 ]
机构
[1] N China Elect Power Univ, Dept Business Management, Beijing 102206, Peoples R China
关键词
RCP scheduling problem; Resource leveling problem; Particle swarm optimization; Project management; Heuristic methods; Project scheduling; PROJECT; SEARCH;
D O I
10.1109/ICMLC.2009.5212393
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a new problem is defined according to the actual project requirement. It is resource leveling problem under resource constrained condition. Unlike the single resource leveling problem, or the resource constrained scheduling problem, this new problem will consider not only resource usage evenness, but also the shortest project duration under resource constrained condition. A new objective function is designed and a particle swarm optimization (PSO) algorithm is presented to solve this problem.
引用
收藏
页码:901 / 906
页数:6
相关论文
共 50 条
  • [1] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [2] TIME-CONSTRAINED RESOURCE LEVELING
    SEIBERT, JE
    EVANS, GW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (03): : 503 - 520
  • [3] Uncertain resource leveling problem
    Ke, Hua
    Zhao, Chenkai
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 33 (04) : 2351 - 2361
  • [4] Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling
    Selvam, Gopinath
    Tadepalli, T. Ch. Madhavi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (04) : 659 - 668
  • [5] Application of CBO and CSS for Resource Allocation and Resource Leveling Problem
    M. Khanzadi
    A. Kaveh
    M. Alipour
    H. Karimi Aghmiuni
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2016, 40 : 1 - 10
  • [6] Application of CBO and CSS for Resource Allocation and Resource Leveling Problem
    Khanzadi, M.
    Kaveh, A.
    Alipour, M.
    Aghmiuni, H. Karimi
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2016, 40 (01) : 1 - 10
  • [7] Research on the effectiveness of activities overlapping in reducing project duration under resource constrained condition
    Chu Z.
    Xu Z.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (09): : 2388 - 2397
  • [8] A hybrid genetic algorithm for resource leveling problem
    Zhao, Hanping
    Liu, Liming
    Jiang, Jiadong
    Li, Ke
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 786 - 790
  • [9] A Memetic Algorithm for the Solution of the Resource Leveling Problem
    Iranagh, Mehdi
    Sonmez, Rifat
    Atan, Tankut
    Uysal, Furkan
    Bettemir, Onder Halis
    BUILDINGS, 2023, 13 (11)
  • [10] A genetic algorithm for the robust resource leveling problem
    Hongbo Li
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 43 - 60