BIM-based integrated delivery technologies for intelligent MEP management in the operation and maintenance phase

被引:134
作者
Hu, Zhen-Zhong [1 ,2 ]
Tian, Pei-Long [1 ]
Li, Sun-Wei [2 ]
Zhang, Jian-Ping [1 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Grad Sch Shenzhen, Shenzhen 518055, Peoples R China
基金
中国国家自然科学基金;
关键词
MEP; BIM; As-built; Operation and maintenance; Facility management; FACILITY MANAGEMENT; MODEL; IMPLEMENTATION; CONSTRUCTION; KNOWLEDGE; SYSTEMS;
D O I
10.1016/j.advengsoft.2017.08.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Incomplete building information in delivery and the lack of compatible tools for Operation and Maintenance (O&M) have hindered the development of the intelligent management of Mechanical, Electrical and Plumbing (MEP) systems. In fact, the information related to the O&M management of the MEP system conventionally comes from the completion documents in the forms of hard copies or unstructured digital files, making it hard to search for useful information in the "sea" of documents and drawings. Therefore, digitalization of information is an urgent task to facilitate the intelligent management of the MEP system. As a project deliverable, the as-built information model shall not only contain geometrical information and necessary construction-related data, but also built-in information useful for the intelligent O&M management. In the present study, based on the Building Information Modeling/Model (BIM) technology, a set of solutions including the automatic establishment of the logic chain for MEP systems, an equipment grouping and labeling scheme and an algorithm to transform BIM information to GIS map model, is proposed to digitalize and integrate the MEP-related information into the as-built model. Subsequently, a cross-platform O&M management system is developed using the MEP-related information in the as-built model to run routine O&M tasks and to effectively response to MEP-related emergencies. The developed system is applied to aid the O&M management of MEP engineering in a real project, showing that the developed system facilitates the intelligent O&M management and guarantees the security of the MEP system and its subsystems. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 16
页数:16
相关论文
共 54 条
[1]  
Akcamete A., 2010, Proceedings of the international conference on computing in civil and building engineering, P151
[2]  
[Anonymous], 2014, 119232014 PAS
[3]  
[Anonymous], 2014, 156864 ISO
[4]  
[Anonymous], 2014, 119242014 BS 4
[5]  
Bo Gu, 2014, Construction in a Global Network. 2014 Construction Research Congress. Proceedings, P1911
[6]   The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components [J].
Bosche, Frederic ;
Ahmed, Mahmoud ;
Turkan, Yelda ;
Haas, Carl T. ;
Haas, Ralph .
AUTOMATION IN CONSTRUCTION, 2015, 49 :201-213
[7]   Determination of the minimum bounding box of an arbitrary solid: an iterative approach [J].
Chan, CK ;
Tan, ST .
COMPUTERS & STRUCTURES, 2001, 79 (15) :1433-1449
[8]  
East E.W., 2012, Construction Operations Building Information Exchange (COBie)
[9]  
Eastman C.M., 2011, BOOK BIM HDB GUIDE B, V2
[10]  
El-Ammari KH, 2006, THESIS