Dynamic planning of construction activities using hybrid simulation

被引:49
作者
Alzraiee, Hani [1 ]
Zayed, Tarek [1 ]
Moselhi, Osama [1 ]
机构
[1] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Traditional project planning method; Simulation; Construction; CPM; SYSTEM DYNAMICS; PROJECT-MANAGEMENT; IMPACT; MODEL;
D O I
10.1016/j.autcon.2014.08.011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditional planning methods such as CPM and PERT have been useful tools to manage construction projects' execution. However, models developed using these methods often fail to deliver realistic estimates of project duration, cost and productivity. Failure of traditional planning methods is attributed to the uncaptured causal-effect relationships that exist among the project variables. This paper presents a new method that integrates DES and SD models to address the operational and soft/strategic variables on a single computation platform. The expected outcomes are realistic project schedule networks and enhanced understanding of the interactions of the project's factors. Two cases from the construction sector are used to test and verify this method. Productivity and completion durations were monitored with/without the impact of factors, in-which a significant discrepancy has been observed. The new method provided better understanding of the project behavior and contributed to overcome limitations associated with traditional planning methods. (C) 2014 Elsevier BM. All rights reserved.
引用
收藏
页码:176 / 192
页数:17
相关论文
共 39 条
[1]  
Abdel-Hamid T., 1991, SOFTWARE PROJECT DYN
[2]  
AbouRizk Simaan M., 2009, Proceedings of the 2009 Winter Simulation Conference (WSC 2009), P2624, DOI 10.1109/WSC.2009.5429307
[3]   Combined discrete-event/continuous simulation for project planning [J].
AbouRizk, SM ;
Wales, RJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (01) :11-20
[4]   SUBJECTIVE AND INTERACTIVE DURATION ESTIMATION [J].
ABOURIZK, SM ;
SAWHNEY, A .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1993, 20 (03) :457-470
[5]  
Alzraiee Hani, 2012, Proceedings of the 2012 Construction Research Congress, P1063
[6]  
Alzraiee H., 2013, THESIS CONCORDIA U M
[7]  
Brailsford SC., 2001, COMP DISCRETE EVENT
[8]  
Caterpillar Inc, 2010, FPC US MAN VERS 3 0
[9]  
Chahal K., 2008, GENERIC FRAMEWORK HY, P1469
[10]   Factors affecting the success of a construction project [J].
Chan, APC ;
Scott, D ;
Chan, APL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01) :153-155