Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms

被引:48
作者
Ebrahimi, Ahmad [1 ]
Jeon, Hyun Woo [1 ,4 ]
Lee, Seokgi [2 ]
Wang, Chao [3 ,4 ]
机构
[1] Louisiana State Univ, Dept Mech & Ind Engn, 3290B Patrick F Taylor Hall, Baton Rouge, LA 70803 USA
[2] Univ Miami, Dept Ind Engn, 1251 Mem Dr 281, Coral Gables, FL 33146 USA
[3] Louisiana State Univ, Bert S Turner Dept Construct Management, 3319 Patrick F Taylor Hall, Baton Rouge, LA 70803 USA
[4] Louisiana State Univ, Ind Assessment Ctr, 3319 Patrick F Taylor Hall, Baton Rouge, LA 70803 USA
关键词
Scheduling; Layout; Energy consumption; Transportation time; Hybrid metaheuristic; Flexible job shop; PARTICLE SWARM OPTIMIZATION; TOTAL WEIGHTED TARDINESS; TRANSPORTATION; CONSUMPTION; SEARCH;
D O I
10.1016/j.cie.2020.106295
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Job scheduling and machine layout are interrelated in improving energy consumption (EC) and productivity measures such as tardiness and represent two important decisions that must be made by manufacturers. This interdependency can be explained by transportation time, which connects scheduling and layout. Scheduling and layout, however, have not been thoroughly studied in conjunction using an integrated model in the context of sustainable manufacturing. Hence, we propose an energy-aware optimization model in which scheduling is integrated with layout in a single-level framework. More specifically, a single objective function is defined to minimize the facility energy cost and the job tardiness penalty, which control EC and tardiness respectively in a flexible job shop system. In order to model machine EC more accurately, we also consider three different machine states: a processing state and two idle states. Our case studies show that the integrated model exhibits better performance in controlling manufacturing EC and job tardiness than a non-integrated' model in which machine locations are uncontrollable and transportation times between machines are unchangeable. To deal with large-sized problems, we also introduce four new metaheuristics. The performances of these new metaheuristics are compared in terms of objective function values and CPU times using various case studies. The results indicate that a hybrid ant colony optimization and simulated annealing (ACO-SA) algorithm provides better performance than the other algorithms. Specifically, our case studies show that the integrated model using ACO-SA can improve the objective function value by around 5% when compared to the non-integrated model.
引用
收藏
页数:21
相关论文
共 38 条
[1]   Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops [J].
Bruzzone, A. A. G. ;
Anghinolfi, D. ;
Paolucci, M. ;
Tonelli, F. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2012, 61 (01) :459-462
[2]   Flexible job-shop scheduling problem under resource constraints [J].
Chan, F. T. S. ;
Wong, T. C. ;
Chan, L. Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (11) :2071-2089
[3]   Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints [J].
Dai Min ;
Tang Dunbing ;
Adriana, Giret ;
Salido Miguel, A. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 59 :143-157
[4]   Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm [J].
Dai, Min ;
Tang, Dunbing ;
Giret, Adriana ;
Salido, Miguel A. ;
Li, W. D. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2013, 29 (05) :418-429
[5]  
Du K.-I., 2016, Search and Optimization by Metaheuristics, P29
[6]   Solving a mathematical model integrating unequal-area facilities layout and part scheduling in a cellular manufacturing system by a genetic algorithm [J].
Ebrahimi, Ahmad ;
Kia, Reza ;
Komijan, Alireza Rashidi .
SPRINGERPLUS, 2016, 5
[7]  
EIA U. S. E. I. A, 2017, INT EN OUTL 2017
[8]  
Fang K., 2011, P 18 CIRP INT C LIFE, P305, DOI DOI 10.1007/978-3-642-19692-8_53
[9]   Parallel-machine scheduling to minimize tardiness penalty and power cost [J].
Fang, Kuei-Tang ;
Lin, Bertrand M. T. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) :224-234
[10]   Energy-efficient scheduling in manufacturing companies: A review and research framework [J].
Gahm, Christian ;
Denz, Florian ;
Dirr, Martin ;
Tuma, Axel .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 248 (03) :744-757