Some scheduling problems with sum-of-proces sing-times-based and job-position-based learning effects

被引:146
作者
Cheng, T. C. Edwin [1 ]
Wu, Chin-Chia [2 ]
Lee, Wen-Chiung [2 ]
机构
[1] Hong Kong Polytech Univ, Dept Logist, Kowloon, Hong Kong, Peoples R China
[2] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
关键词
scheduling; learning effect; single-machine; flowshop;
D O I
10.1016/j.ins.2008.02.002
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper we introduce a new scheduling model with learning effects in which the actual processing time of a job is a function of the total normal processing times of the jobs already processed and of the job's scheduled position. We show that the single-machine problems to minimize makespan and total completion time are polynomially solvable. In addition, we show that the problems to minimize total weighted completion time and maximum lateness are polynomially solvable under certain agreeable conditions. Finally, we present polynomial-time optimal solutions for some special cases of the m-machine flowshop problems to minimize makespan and total completion time. (c) 2008 Elsevier Inc. All rights reserved.
引用
收藏
页码:2476 / 2487
页数:12
相关论文
共 23 条
[1]   Single-machine scheduling with learning considerations [J].
Biskup, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (01) :173-178
[2]  
BISKUP D, 2007, EUROPEAN J OPERATONA
[3]   A bi-criteria two-machine flowshop scheduling problem with a learning effect [J].
Chen, P. ;
Wu, C-C ;
Lee, W-C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (09) :1113-1125
[4]   A study on the critical success factors for corporations embarking on knowledge community-based e-learning [J].
Chen, Ruey-Shun ;
Hsiang, Chin-Hsiao .
INFORMATION SCIENCES, 2007, 177 (02) :570-586
[5]   A note on flow shop scheduling problems with a learning effect on no-idle dominant machines [J].
Cheng, MingBao ;
Sun, ShiJie ;
Yu, Ying .
APPLIED MATHEMATICS AND COMPUTATION, 2007, 184 (02) :945-949
[6]   Single machine scheduling with learning effect considerations [J].
Cheng, TCE ;
Wang, GQ .
ANNALS OF OPERATIONS RESEARCH, 2000, 98 (1-4) :273-290
[7]  
EREN T, 2007, APPL MATH MODELLING
[8]   Minimizing total tardiness in a scheduling problem with a learning effect [J].
Eren, Tamer ;
Guner, Ertan .
APPLIED MATHEMATICAL MODELLING, 2007, 31 (07) :1351-1361
[9]  
Heiser J, 1999, OPERATIONS MANAGEMEN
[10]  
JANIAK A, 2007, COMPUTERS OPERATIONS