A new multi-period optimization model for resilient-sustainable project portfolio evaluation under interval-valued Pythagorean fuzzy sets with a case study

被引:18
作者
Mohagheghi, Vahid [1 ]
Mousavi, Seyed Meysam [1 ]
机构
[1] Shahed Univ, Dept Ind Engn, Tehran, Iran
关键词
Multi-period project portfolio; Resilience; Sustainability; Interval-valued Pythagorean fuzzy sets; Multi-objective optimization; Petrochemical projects; DECISION-MAKING; MULTICRITERIA FRAMEWORK; MEMBERSHIP GRADES; SELECTION; EXTENSION; NUMBERS; PILLAR; TOPSIS;
D O I
10.1007/s13042-021-01403-8
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In project portfolio selection, a set of goals is considered that is derived from the strategies and missions of firms. Due to the importance of social and environmental aspects of decision making in recent years, several attempts have been made to address sustainability in project portfolio selection. Given the turbulent environment and market conditions, one of the issues that has been the focus point of many scholars and practitioners is resilience. Simultaneous consideration of resiliency and sustainability in business environments is a new trend that has recently emerged. In this paper, to improve the decision-making process of firms in project portfolio selection, a novel resilient-sustainable project portfolio evaluation and optimization process is introduced. This new approach is based on two main phases. First, the projects are separately evaluated based on resiliency and sustainability criteria. In this process, weights of decision-makers and criteria are computed by new processes, and also the concept of linear assignment is applied. Then, in the second phase, a new multi-objective mathematical model is presented that aims at presenting a portfolio of multi-period projects with objectives of sustainability, resilience, and skill utilization. Then, the concept of the VIKOR method is applied to make an equivalent model and find the best portfolio. To address uncertainty in this process, interval-valued Pythagorean fuzzy sets (IVPFSs) are used. Utilization of such sets provides the process with high power in expressing the agreements, disagreements, and hesitations of project experts. To display the application steps of this method, a case study in petrochemical projects is presented and solved. The results show that the method can assist project portfolio managers in selecting and planning projects in addition to selecting the best project manager for each period of each project. Moreover, the manager can consider sustainability and resiliency in the selection and implementation of the projects.
引用
收藏
页码:3541 / 3560
页数:20
相关论文
共 57 条
[1]  
[Anonymous], 2008, THESIS NTNU
[2]  
Antucheviciene J, 2019, SOLUTION MODELS BASE, DOI [10.3390/books978-3-03921-007-7, DOI 10.3390/BOOKS978-3-03921-007-7]
[3]   Interval-valued Pythagorean fuzzy TODIM approach through point operator-based similarity measures for multicriteria group decision making [J].
Biswas, Animesh ;
Sarkar, Biswajit .
KYBERNETES, 2019, 48 (03) :496-519
[4]   A framework for strategic sustainable development [J].
Broman, Goran Ingvar ;
Robert, Karl-Henrik .
JOURNAL OF CLEANER PRODUCTION, 2017, 140 :17-31
[5]   Bringing the "Missing Pillar" into Sustainable Development Goals: Towards Intersubjective Values-Based Indicators [J].
Burford, Gemma ;
Hoover, Elona ;
Velasco, Ismael ;
Janouskova, Svatava ;
Jimenez, Alicia ;
Piggot, Georgia ;
Podger, Dimity ;
Harder, Marie K. .
SUSTAINABILITY, 2013, 5 (07) :3035-3059
[6]   A linear assignment method for multiple-criteria decision analysis with interval type-2 fuzzy sets [J].
Chen, Ting-Yu .
APPLIED SOFT COMPUTING, 2013, 13 (05) :2735-2748
[7]   Strategic alignment and value maximization for IT project portfolios [J].
Chiang, I. Robert ;
Nunez, Manuel A. .
INFORMATION TECHNOLOGY & MANAGEMENT, 2013, 14 (02) :143-157
[8]   SOLVING CONSTRUCTION PROJECT SELECTION PROBLEM BY A NEW UNCERTAIN WEIGHTING AND RANKING BASED ON COMPROMISE SOLUTION WITH LINEAR ASSIGNMENT APPROACH [J].
Davoudabadi, Reza ;
Mousavi, Seyed Meysam ;
Saparauskas, Jonas ;
Gitinavard, Hossein .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) :241-251
[9]  
EIKLAND S, 1998, NO WATERS MANAGEMENT, P90
[10]   A NEW IMPROVED SCORE FUNCTION OF AN INTERVAL-VALUED PYTHAGOREAN FUZZY SET BASED TOPSIS METHOD [J].
Garg, Harish .
INTERNATIONAL JOURNAL FOR UNCERTAINTY QUANTIFICATION, 2017, 7 (05) :463-474