Geological adaptive cutterhead selection for EPB shield based on BP neural network

被引:2
作者
Lin, Laikuang [1 ]
Xia, Yimin [1 ]
He, Fei [2 ]
Mao, Qingsong [1 ]
Zhang, Kui [1 ]
机构
[1] Cent S Univ, Coll Mech & Elect Engn, Changsha, Hunan, Peoples R China
[2] China Railway Engn Equipment Grp CO LTD, Zhengzhou, Henan Province, Peoples R China
来源
MACHINE DESIGN AND MANUFACTURING ENGINEERING III | 2014年
关键词
EPB shield; cutterhead types; geology adaptability; BP neural network; TBM SELECTION;
D O I
10.4028/www.scientific.net/AMM.607.118
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In view of complex and fuzziness of geological adaptive cutterhead selection for earth pressure balance (EPB) shield, a cutterhead selection method based on BP neural network is put forward. Considering the structure characteristics of EPB shield cutterhead, typical cutterhead types are classified and summarized based on cutterhead topology structure and number of spokes. After analyzing the determinants of cutterhead selection, one-to-many mapping relation between cutterhead type and geological parameters is put forward, and then core geologic parameters related to cutterhead selection are concluded. The feasibility of using neural network method to choose the cutterhead type is analyzed, and a BP neural network training model for cutterhead selection is set up and tested in testing sample data. The result shows that the selected cutterhead and the construction cutterhead are basically consistent. The feasibility of this method is proved and it can be theoretical basis for the cutterhead structure design which will improve scientific of cutterhead selection.
引用
收藏
页码:118 / 123
页数:6
相关论文
共 9 条
[1]   Investigation into the effects of different rocks on rock cuttability by a V-type disc cutter [J].
Balci, C. ;
Tumac, D. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 30 :183-193
[2]   Vehicular traffic noise modeling using artificial neural network approach [J].
Kumar, Paras ;
Nigam, S. P. ;
Kumar, Narotam .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2014, 40 :111-122
[3]   Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions [J].
Shahriar, Kourosh ;
Sharifzadeh, Mostafa ;
Hamidi, Jafar Khademi .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2008, 23 (03) :318-325
[4]   Determination of the cutterhead torque for EPB shield tunneling machine [J].
Shi, Hu ;
Yang, Huayong ;
Gong, Guofang ;
Wang, Lintao .
AUTOMATION IN CONSTRUCTION, 2011, 20 (08) :1087-1095
[5]  
SONG Ke-zhi, 2007, ROAD MACHINERY CONST, V6, P44
[6]  
Song Yun, 2009, THESIS SW JIAO TONG
[7]  
[王洪新 Wang Hongxin], 2010, [土木工程学报, China Civil Engineering Journal], V43, P88
[8]  
WANG Meng-Shu, 2006, TUNNEL CONSTRUCTION, V2
[9]   Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods [J].
Yazdani-Chamzini, Abdolreza ;
Yakhchali, Siamak Haji .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 30 :194-204