Developing a key performance indicators tree for lean and smart production systems

被引:56
作者
Ante, G. [1 ]
Facchini, F. [2 ]
Mossa, G. [2 ]
Digiesi, S. [2 ]
机构
[1] BOSCH Tecnol Diesel SpA, Modugno, BA, Italy
[2] Polytech Univ Bari, Dept Mech Math & Management, Viale Japigia 182, Bari, Italy
关键词
KPI; PMS; lean production; BPS; industry; 4.0; MANAGEMENT;
D O I
10.1016/j.ifacol.2018.08.227
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a tree-like structure of Key Performance Indicators (KPIs) is proposed to describe the Performance Measurement System (PMS) of a lean production system. The KPIs and their supporting measurement elements are identified and categorized in a multi-level hierarchy designed to give answers at strategic, tactical, and operational level. Examples of the dependencies between high-level decision variables, KPIs, and their measurement elements are presented with reference to the Bosch Production System (BPS) of a multinational manufacturer leader in the automotive industry. Moreover, the role and the impact of the KPIs selection in supporting, addressing, and evaluating the implementation of smart manufacturing projects in the fourth industrial revolution (14.0) is shown. (C) 2018, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:13 / 18
页数:6
相关论文
共 19 条
[1]   Workforce Aging in Production Systems: Modeling and Performance Evaluation [J].
Boenzi, F. ;
Mossa, G. ;
Mummolo, G. ;
Romano, V. A. .
25TH DAAAM INTERNATIONAL SYMPOSIUM ON INTELLIGENT MANUFACTURING AND AUTOMATION, 2014, 2015, 100 :1108-1115
[2]  
Boenzi F, 2015, P 26 DAAAM INT S, P980
[3]  
Calleja Crespo D., 2014, EUROPEAN COMPETITIVE, P76
[4]  
Cross K., 1992, CMA Magazine, P20
[5]   A Cyber - based DSS for a Low Carbon Integrated Waste Management System in a Smart City [J].
Digiesi, S. ;
Facchini, F. ;
Mossa, G. ;
Mummolo, G. ;
Verriello, R. .
IFAC PAPERSONLINE, 2015, 48 (03) :2356-2361
[6]  
Digiesi Salvatore., 2017, XVII International Scientific Conference on Industrial Systems (IS'17), P8
[7]   Reviewing and improving performance measurement systems: An action research [J].
Frutuoso Braz, Renata Gornes ;
Scavarda, Luiz Felipe ;
Martins, Roberto Antonio .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 133 (02) :751-760
[8]  
Goyal M., 2006, POMS ANN M BOST MA
[9]  
International Organization for Standardization, 2014, ISO 22400-2:2014
[10]  
International Organization for Standardization, 2014, ISO Standard No. 22400-1:2014