Complications in disassembly line balancing

被引:19
作者
Güngör, A [1 ]
Gupta, SM [1 ]
Pochampally, K [1 ]
Kamarthi, SV [1 ]
机构
[1] Northeastern Univ, Dept MIME, Lab Responsible Mfg, Boston, MA 02115 USA
来源
ENVIRONMENTALLY CONSCIOUS MANUFACTURING | 2001年 / 4193卷
关键词
environment; product recovery; disassembly; line balancing; heuristic;
D O I
10.1117/12.417274
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Disassembly line is, perhaps, the most suitable way for the disassembly of large products or small products in large quantities. In this paper, we address the disassembly line balancing problem (DLBP) and the challenges that come with it. The objective of balancing the disassembly line is to utilize the disassembly line in an optimized fashion while meeting the demand for the parts retrieved from the returned products. Although, the traditional line balancing problem for assembly has been studied for a long time, so far, no one has formally talked about the DLBP. In this work, our primary objective is to address the DLBP related issues. However, we also present a heuristic to demonstrate how several important factors in disassembly can be incorporated into the solution process of a DLBP. An example is considered to illustrate the use of the heuristic.
引用
收藏
页码:289 / 298
页数:10
相关论文
共 19 条
[1]  
ANSEMS AMM, 1994, P IEEE INT S EL ENV
[2]   DISASSEMBLY AND RECYCLING OF ELECTRONIC CONSUMER PRODUCTS - AN OVERVIEW [J].
DERON, A ;
PENEV, K .
TECHNOVATION, 1995, 15 (06) :363-374
[3]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[4]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[5]  
GUNGOR A, 2000, IN PRESS INT J PRODU
[6]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[7]   Material flow control and scheduling in a disassembly environment [J].
Kizilkaya, E ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) :93-96
[8]   In search of a disassembly factory [J].
Kochan, A .
ASSEMBLY AUTOMATION, 1995, 15 (04) :16-17
[9]  
KOPACEK P, 1996, IEEE C EM TECHN FACT, P567
[10]  
MENRAD W, 1999, P 2 INT WORK SEM REU, P81