Voltage Security Constrained Stochastic Programming Model for Day-Ahead BESS Schedule in Co-Optimization of T&D Systems

被引:47
作者
Mohseni-Bonab, Seyed Masoud [1 ]
Kamwa, Innocent [2 ]
Moeini, Ali [2 ]
Rabiee, Abbas [3 ]
机构
[1] Univ Laval, Elect Engn Dept, Quebec City, PQ G1V 0A6, Canada
[2] Hydro Quebec Res Inst, IREQ, Power Syst Simulat & Evolut Dept, Varennes, PQ J3X 1S1, Canada
[3] Univ Zanjan, Elect Engn Dept, Zanjan 4537138791, Iran
基金
加拿大自然科学与工程研究理事会;
关键词
Resource management; Load flow; Reactive power; Stochastic processes; Photovoltaic systems; Wind power generation; Integrated transmission and distribution (T&D) systems; battery energy storage systems (BESS); voltage security constrained stochastic optimal BESS allocation (VSC-SOBA); co-optimization; loading margin; wind farms (WF); POWER-FLOW; DISTRIBUTION NETWORKS; COMBINED TRANSMISSION; SIMULATION; WIND; TIME; OPF;
D O I
10.1109/TSTE.2019.2892024
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Wind and photovoltaic are now the fastest growing renewable energy sources (RESs) around the world and mitigation of the inherent intermittency of such energy sources with battery energy storage systems (BESS) has gained attention in recent years. In this paper, a novel voltage security stochastic optimal BESS allocation (VSC-SOBA) problem is proposed in integrated transmission and distribution (T&D) systems while including realistic models of distributed energy resources. The scheduling problem is studied under stochastic framework by considering the wind power uncertainty. Besides, hourly profiles of load as well as wind and photovoltaic RESs are taken into account. Maximizing loading margin (LM) with the best allocation of different BESSs types is the main objective of this paper. Moreover, the allocation impact on voltage deviation of load buses is investigated. The mixed integer non-linear programming based model is implemented in GAMS software considering P, Q, and simultaneous PQ BESS control. The performance of the proposed method is examined on T&D 16-bus, 62-bus, 286-bus, and large-scale 1142-bus test systems and the findings show that in the case of VSC-SOBA, the desired LM is maximized in the presence of optimal BESS control variables.
引用
收藏
页码:391 / 404
页数:14
相关论文
共 42 条
[1]  
Alsaidan I., 2016, 2016 IEEE POWER ENER, P1
[2]  
Alsaidan I, 2016, NORTH AMER POW SYMP
[3]  
[Anonymous], VOLT STAB CRIT UND L
[4]  
[Anonymous], 2016, 2016 IEEEPES TRANSMI
[5]  
[Anonymous], 1994, POWER SYSTEM STABILI
[6]  
[Anonymous], 2002, IEEE PES POWER SYSTE
[7]   A parallel processing approach to dynamic simulations of combined transmission and distribution systems [J].
Aristidou, P. ;
Van Cutsem, T. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 72 :58-65
[8]   Equivalency of Continuation and Optimization Methods to Determine Saddle-Node and Limit-Induced Bifurcations in Power Systems [J].
Avalos, Rafael J. ;
Canizares, Claudio A. ;
Milano, Federico ;
Conejo, Antonio J. .
IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I-REGULAR PAPERS, 2009, 56 (01) :210-223
[9]   Technique to interconnect and control co-simulation systems [J].
Broderick, Stephen ;
Cruden, Andrew ;
Sharkh, Suleiman ;
Bessant, Nigel .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2017, 11 (12) :3115-3124
[10]  
[Brooke Anthony GAMS GAMS], 1998, A Users Guide