Stochastic two-machine flowshop scheduling problem with total completion time criterion

被引:0
作者
Soroush, HM
Allahverdi, A
机构
[1] Kuwait Univ, Coll Sci, Dept Stat & Operat Res, Safat, Kuwait
[2] Kuwait Univ, Coll Engn & Petr, Dept Ind & Management Syst Engn, Safat, Kuwait
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2005年 / 12卷 / 02期
关键词
scheduling; flowshop; stochastic; total completion time;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Most of the available literature on the stochastic two-machine flowshop scheduling problem, in which job processing times are assumed to be non-negative random variables, utilize the makespan criterion. A couple of researchers address the problem with total completion time criterion but with the assumption that processing times are independently and identically distributed. In this paper, we study a stochastic two-machine flowshop problem where processing times have distinct distributions and determine a schedule that minimizes the expected total completion times of all jobs (an NP-hard problem). We fully explore and present solution approaches for three different scenarios of the problem where processing times have independent normal distributions. The first scenario can be solved either exactly or approximately by some appropriate modifications of the respective existing exact Or heuristic solution approaches for the deterministic case of the problem. For the other two scenarios with normal processing times, we propose some exact efficient solution methods. Another scenario of the problem is also analyzed where processing times have general distributions. This scenario can be solved approximately by the classical methods for the deterministic problem which minimizes a lower bound on the optimal expected total completion time. Furthermore, we provide some numerical examples to illustrate the proposed scenarios. Significance: The vast majority of scheduling literature on the two-machine flowshop scheduling problem assumes that job processing times are known with certainty, However, in most real world flowshop systems, it is not appropriate to model processing times as deterministic. Moreover, the existing literature on flowshop scheduling with random processing times mainly uses the makespan criterion. In this paper, we address the two-machine flowshop scheduling problem to minimize the expected total completion time where job processing times have distinct distributions.
引用
收藏
页码:159 / 171
页数:13
相关论文
共 33 条
[1]   New heuristics to minimize total completion time in m-machine flowshops [J].
Allahverdi, A ;
Aldowaisan, T .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (01) :71-83
[2]   Scheduling in stochastic flowshops with independent setup, processing and removal times [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (10) :955-960
[3]  
ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
[4]   Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (02) :111-127
[5]  
Cadambi B. V., 1993, Opsearch, V30, P35
[6]  
Cai X, 1997, NAV RES LOG, V44, P531, DOI 10.1002/(SICI)1520-6750(199709)44:6<531::AID-NAV2>3.0.CO
[7]  
2-4
[8]   An improved branch-and-bound algorithm for the two machine total completion time flow shop problem [J].
Della Croce, F ;
Ghirardi, M ;
Tadei, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (02) :293-301
[9]   The two-machine total completion time flow shop problem [J].
DellaCroce, F ;
Narayan, V ;
Tadei, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :227-237
[10]   The two-machine stochastic flowshop problem with arbitrary processing time distributions [J].
Elmaghraby, SE ;
Thoney, KA .
IIE TRANSACTIONS, 1999, 31 (05) :467-477