Experimental study of the shear behaviour of concrete-grout-concrete joints

被引:27
作者
Zhao, Yong [1 ]
Zou, Renbo [1 ]
Ding, Tao [1 ]
Xiao, Jianzhuang [1 ]
机构
[1] Tongji Univ, Dept Struct Engn, Coll Civil Engn, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Concrete-grout-concrete joint; Shear behaviour; Grouted sleeve connection; Extended friction shear model; REINFORCED-CONCRETE; SEISMIC PERFORMANCE; SLEEVE CONNECTIONS; PRECAST COLUMNS; STRENGTH; CONSTRUCTION; PREFABRICATION; CAPACITY;
D O I
10.1016/j.jobe.2021.103095
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Grouted sleeve connections are currently widely adopted in precast concrete structures. For this kind of connection, there exists a kind of multilayer concrete-grout-concrete joint whose the mechanical behaviour is quite different from that of the new and old concrete interface. Simply following the current bonding theories and conclusions of new and old concrete interfaces will cause uncertainties in the structural analysis and design. In this study, monotonic and cyclic loading tests were both employed to examine the influence of the grouting thickness and the interfacial shear reinforcement ratio on the shear behaviour of this new type of joint. The shear behaviour was also compared with that of the new and old concrete interface. The results showed that the shear capacity of the concrete-grout-concrete joint was lower than that of the new and old concrete interface. Specimens with a thinner grouting layer or with a larger ratio of shear reinforcement have a higher shear capacity. According to the experimental results, the shear transfer mechanism of the concrete-grout-concrete joint was proposed based on the extended friction shear model, and the modified shear capacity calculation model was then established.
引用
收藏
页数:14
相关论文
共 44 条
[1]   Seismic tests of beam-to-column connections in a precast concrete frame [J].
Alcocer, SM ;
Carranza, R ;
Perez-Navarrete, D ;
Martinez, R .
PCI JOURNAL, 2002, 47 (03) :70-+
[2]   Seismic Analysis of Precast Concrete Bridge Columns Connected with Grouted Splice Sleeve Connectors [J].
Ameli, M. J. ;
Pantelides, Chris P. .
JOURNAL OF STRUCTURAL ENGINEERING, 2017, 143 (02)
[3]  
[Anonymous], 2014, Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14). ACI 318-14
[4]  
[Anonymous], 2012, MODEL CODE 2010 INT
[5]  
[Anonymous], 1993, CEB-FIP MC 90
[6]  
[Anonymous], 1987, SEISMIC DESIGN CONSI
[7]  
[Anonymous], 2010, PCI DES HDB
[8]  
Birkeland P.W., 1966, ACI J, V63, P345
[9]   Development and testing of precast concrete beam-to-column connections [J].
Choi, H. -K. ;
Choi, Y. -C. ;
Choi, C. -S. .
ENGINEERING STRUCTURES, 2013, 56 :1820-1835
[10]   Seismic performance of precast reinforced concrete buildings with dowel pin connections [J].
Clementi, F. ;
Scalbi, A. ;
Lenci, S. .
JOURNAL OF BUILDING ENGINEERING, 2016, 7 :224-238