Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem

被引:30
作者
Bouffard, Veronique [1 ]
Ferland, Jacques A. [1 ]
机构
[1] Univ Montreal, Succ Ctr Ville, Montreal, PQ H3C 3J7, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
simulated annealing; threshold accepting; tabu search; diversification; variable neighborhood search; resource-constrained scheduling;
D O I
10.1007/s10951-007-0043-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The purpose of this paper is to improve the simulated annealing method with a variable neighborhood search to solve the resource-constrained scheduling problem. We also compare numerically this method with other neighborhood search (local search) techniques: threshold accepting methods and tabu search. Furthermore, we combine these techniques with multistart diversification strategies and with the variable neighborhood search technique. A thorough numerical study is completed to set the parameters of the different methods and to compare the quality of the solutions that they generate. The numerical results indicate that the simulated annealing method improved with a variable neighborhood search technique is indeed the best solution method.
引用
收藏
页码:375 / 386
页数:12
相关论文
共 35 条
[1]   A robust genetic algorithm for resource allocation in project scheduling [J].
Alcaraz, J ;
Maroto, C .
ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) :83-109
[2]  
[Anonymous], 1986, C NUM METH COMB OPT
[3]   A LARGE-SCALE TIMETABLING PROBLEM [J].
AUBIN, J ;
FERLAND, JA .
COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (01) :67-77
[4]  
Baar T., 1998, METAHEURISTICS ADV T, P1
[5]   Satisfiability tests and time-bound adjustments for cumulative scheduling problems [J].
Baptiste, P ;
Le Pape, C ;
Nuijten, W .
ANNALS OF OPERATIONS RESEARCH, 1999, 92 (0) :305-333
[6]  
Blazewicz J., 1978, P 1 M AFCET SMF APPL, P169
[7]  
BOUFFARD V, 2003, THESIS U MONTREAL DE
[8]  
BOULEIMEN K, 1998, P 6 INT WORKSH PROJ, P19
[9]  
Brucker P, 2001, LECT NOTES COMPUT SC, V2079, P277
[10]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41