An optimization model for operating room scheduling to reduce blocking across the perioperative process

被引:29
作者
Abedini, Amin [1 ]
Li, Wei [1 ]
Ye, Honghan [1 ]
机构
[1] Univ Kentucky, Dept Mech Engn, Lexington, KY 40506 USA
来源
45TH SME NORTH AMERICAN MANUFACTURING RESEARCH CONFERENCE (NAMRC 45) | 2017年 / 10卷
基金
美国医疗保健研究与质量局;
关键词
operating room; scheduling; optimization; simulation; statistical process control; INTEGER PROGRAMMING APPROACH; IMPACT; MANAGEMENT; ALLOCATION; EFFICIENCY;
D O I
10.1016/j.promfg.2017.07.022
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Operating room (OR) scheduling is important. Because of increasing demand for surgical services, hospitals must provide high quality care more efficiently with limited resources. When constructing the OR schedule, it is necessary to consider the availability of downstream resources, such as intensive care unit (ICU) and post anaesthesia care unit (PACU). The unavailability of downstream resources causes blockings between every two consecutive stages. In this paper we address the master surgical schedule (MSS) problem in order to minimize blockings between two consecutive stages. First, we present a blocking minimization (BM) model for the MSS by using integer programming, based on deterministic data. The BM model determines the OR block schedule for the next day by considering the current stage occupancy (number of patients) in order to minimize the number of blockings between intraop and postop stages. Second, we test the effectiveness of our model under variations in case times and patient arrivals, by using simulation. The simulation results show that our BM model can significantly reduce the number of blockings by 94% improvement over the base model. Scheduling patient flow across the 3-stage periop process can be applied to work flow scheduling for the s-stage flow shop shop production in manufacutirng, and also Smoothing patient flow in periop process can be applied to no-wait flow shop production. (C) 2017 Published by Elsevier B.V.
引用
收藏
页码:60 / 70
页数:11
相关论文
共 27 条
  • [1] Operating Room Planning under Surgery Type and Priority Constraints
    Abedini, Amin
    Ye, Honghan
    Li, Wei
    [J]. 44TH NORTH AMERICAN MANUFACTURING RESEARCH CONFERENCE, NAMRC 44, 2016, 5 : 15 - 25
  • [2] A combined optimization-simulation approach to the master surgical scheduling problem
    Banditori, Carlo
    Cappanera, Paola
    Visintin, Filippo
    [J]. IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2013, 24 (02) : 155 - 187
  • [3] Status quo and current trends of operating room management in Germany
    Baumgart, Andre
    Schuepfer, Guido
    Welker, Andreas
    Bender, Hans-Joachim
    Schleppers, Alexander
    [J]. CURRENT OPINION IN ANESTHESIOLOGY, 2010, 23 (02) : 193 - 200
  • [4] A goal programming approach to strategic resource allocation in acute care hospitals
    Blake, JT
    Carter, MW
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 140 (03) : 541 - 561
  • [5] Blake T.J., 2003, Socio-Economic Planning Sciences, V37, P45, DOI DOI 10.1016/S0038-0121(02)00009-5
  • [6] Operating room planning and scheduling: A literature review
    Cardoen, Brecht
    Demeulemeester, Erik
    Belien, Jeroen
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 201 (03) : 921 - 932
  • [7] Optimization of surgery sequencing and scheduling decisions under uncertainty
    Denton B.
    Viapiano J.
    Vogl A.
    [J]. Health Care Management Science, 2007, 10 (1) : 13 - 24
  • [8] Optimal Allocation of Surgery Blocks to Operating Rooms Under Uncertainty
    Denton, Brian T.
    Miller, Andrew J.
    Balasubramanian, Hari J.
    Huschka, Todd R.
    [J]. OPERATIONS RESEARCH, 2010, 58 (04) : 802 - 816
  • [9] How to schedule elective surgical cases into specific operating rooms to maximize the efficiency of use of operating room time
    Dexter, F
    Traub, RD
    [J]. ANESTHESIA AND ANALGESIA, 2002, 94 (04) : 933 - 942
  • [10] Dexter Franklin, 2003, Curr Opin Anaesthesiol, V16, P619, DOI 10.1097/00001503-200312000-00008