Normal-conducting RF structure test facilities and results

被引:29
作者
Adolphsen, C [1 ]
机构
[1] Stanford Univ, Stanford Linear Accelerator Ctr, Stanford, CA 94309 USA
来源
PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5 | 2003年
关键词
D O I
10.1109/PAC.2003.1289005
中图分类号
O412 [相对论、场论]; O572.2 [粒子物理学];
学科分类号
摘要
The designs for a next-generation linear collider based on normal-conducting rf structures require operation at gradients much higher than those in existing linacs. For the NLC/JLC 11.4-GHz structures, the design unloaded gradient is 65 MV/m, which is about four times that of the 2.9-GHz SLAC Linac. The CLIC proposal using 30-GHz structures requires an even higher gradient, 170 MV/m. Both the CLIC and NLC/JLC groups are aggressively pursuing programs to develop structures that operate reliably at these gradients and also have acceptable efficiencies and transverse wakefields. Much progress has been made in the past few years, and this paper reviews the programs, test facilities and results from this research.
引用
收藏
页码:668 / 672
页数:5
相关论文
共 10 条
[1]  
ADOLPHSEN C, 2002, TH464 LINAC
[2]  
[Anonymous], 2003, SLACR606 INT LIN COL
[3]  
BRAUN H, 2000, EPAC2000
[4]  
DOLGASHEV V, STATUS X BAND SW STR
[5]  
NANTISTA C, NOVEL ACCELERATOR ST
[6]  
SOLYAK N, DEV X BAND ACCELERAT
[7]  
SYRATCHEV I, 2002013 CERN PSRF
[8]  
WANG J, 1989, SLACPUB4866
[9]  
WUENSCH W, DEMONSTRATION HIGH G
[10]  
SLACPUB9906