共 36 条
[22]
KOREN Y, 1999, ANN CIRP, V48
[24]
Lopes L. Seabra, 1995, IEEE INT C INT ROB S, V3, P197
[26]
Predictable scheduling of a job shop subject to breakdowns
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
1998, 14 (03)
:365-378
[29]
Park SC, 1997, IEEE T ROBOTIC AUTOM, V13, P486, DOI 10.1109/70.611301
[30]
Information-based dynamic manufacturing system scheduling
[J].
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS,
2000, 12 (2-3)
:219-234