Identification of coordination factors affecting building projects performance

被引:67
作者
Alaloul, Wesam Salah [1 ]
Liew, Mohd Shahir [1 ]
Zawawi, Noor Amila Wan Abdullah [1 ]
机构
[1] Univ Teknol PETRONAS, Dept Civil & Environm Engn, Tronoh 32610, Perak, Malaysia
关键词
Coordination factors; Building projects; Performance management; DELPHI TECHNIQUE; CONSTRUCTION; PERSPECTIVE;
D O I
10.1016/j.aej.2016.06.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction projects performance requires improvement to fulfil the complexity of the stakeholders' needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII) such as Scheduling (RII = 0.97), Quality assurance plan (RII = 0.93), and all parties' participation in plans (RII = 0.89). These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance. (C) 2016 Faculty of Engineering, Alexandria University. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
引用
收藏
页码:2689 / 2698
页数:10
相关论文
共 32 条
[1]  
Abdul KadirM.R., 2005, STRUCT SURV, V23, P42
[2]  
Akintoye A., 2000, European Journal of Purchasing & Supply Management, V6, P159, DOI 10.1016/S0969-7012(00)00012-5
[3]  
[Anonymous], 1994, INT EXTENSION EXPLOR
[4]   Performance measurement in construction [J].
Bassioni, HA ;
Price, ADF ;
Hassan, TM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (02) :42-50
[5]   Time-cost relationship of public sector projects in Malaysia [J].
Chan, Albert P.C. .
2001, Elsevier Ltd (19)
[6]  
Crowston K., 1994, A taxonomy of organizational dependencies and coordination mechanisms
[7]   DECISION VARIABLES FOR SELECTING PROTOTYPING IN INFORMATION-SYSTEMS DEVELOPMENT - A DELPHI STUDY OF MIS MANAGERS [J].
DOKE, ER ;
SWANSON, NE .
INFORMATION & MANAGEMENT, 1995, 29 (04) :173-182
[8]   Developing a quality criteria framework for patient decision aids: online international Delphi consensus process [J].
Elwyn, Glyn ;
O'Connor, Annette ;
Stacey, Dawn ;
Volk, Robert ;
Edwards, Adrian ;
Coulter, Angela ;
Thomson, Richard ;
Barrat, Alexandra ;
Butow, Phyllis ;
Barry, Michael ;
Mulley, Albert G. ;
Sepucha, Karen ;
Bernstein, Steven ;
Clarke, Aileen ;
Entwistle, Vikki ;
Feldman-Stewart, Deb ;
Holmes-Rovner, Margaret ;
Llewellyn-Thomas, Hilary ;
Moumjid, Nora ;
Ruland, Cornelia ;
Sykes, Alan ;
Whelan, Tim .
BMJ-BRITISH MEDICAL JOURNAL, 2006, 333 (7565) :417-419
[9]   Construction industry productivity and the potential for collaborative practice [J].
Fulford, Richard ;
Standing, Craig .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (02) :315-326
[10]  
Ghaderi Hojjat., 2007, AAAI 07 P 22 NATL C, P421