Balancing assembly line with skilled and unskilled workers

被引:106
|
作者
Corominas, Albert [1 ]
Pastor, Rafael [1 ]
Plans, Joan [1 ]
机构
[1] Univ Politecn Cataluna, IOC Res Inst, E-08028 Barcelona, Spain
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2008年 / 36卷 / 06期
关键词
line balancing; application; manufacturing; production;
D O I
10.1016/j.omega.2006.03.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we present the process of rebalancing the line at motorcycle-assembly plant. The company found it necessary to rebalance its line, since it needs to increase production in the spring and summer months. The main characteristics of the problem are as follows: (i) the company hires temporary staff, who need more time to carry out their tasks than permanent workers; (ii) there must always be at least one skilled employee working alongside an unskilled one; and (iii) different task groups are incompatible with each other (clean-hands tasks and dirty-hands tasks). The goal is to minimise the number of temporary workers required, given a cycle time and the team of workers on staff. The problem is modelled as a binary linear program (BLP) and solved optimally by means of the ILOG CPLEX 9.0 optimiser. The solution provided, namely 12 permanent workers (skilled) and two temporary workers (unskilled), is an improvement on the solution implemented by the business, which involved 12 permanent workers and four temporary workers. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1126 / 1132
页数:7
相关论文
共 50 条
  • [31] A Web-based interactive advisor for assembly line balancing
    Jiao, Jianxin
    Kumar, Arun
    Martin, Wilfried
    International Journal of Advanced Manufacturing Technology, 2006, 27 (11-12): : 1192 - 1201
  • [32] A MULTIPLE-RULE HEURISTIC FOR ASSEMBLY-LINE BALANCING
    BOCTOR, FF
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (01) : 62 - 69
  • [33] Enhanced Assembly Line Balancing and Scheduling Methodology for the Aeronautical Industry
    Borreguero, T.
    Mas, F.
    Menendez, Jl.
    Barreda, M. A.
    MESIC MANUFACTURING ENGINEERING SOCIETY INTERNATIONAL CONFERENCE 2015, 2015, 132 : 990 - 997
  • [34] Assembly Line Worker Assignment and Balancing Problem with Positional Constraints
    Yang, Hyungjoon
    Lee, Je-Hun
    Kim, Hyun-Jung
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 3 - 11
  • [35] Stochastic assembly line balancing based on workstation complexity measurement
    Liu X.
    Chen J.
    Lan L.
    Fan G.
    Li A.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2018, 24 (05): : 1191 - 1199
  • [36] A dynamic programming based heuristic for the assembly line balancing problem
    Bautista, Joaquin
    Pereira, Jordi
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) : 787 - 794
  • [37] Assembly line balancing: What happened in the last fifteen years?
    Boysen, Nils
    Schulze, Philipp
    Scholl, Armin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 301 (03) : 797 - 814
  • [38] Improvement of Assembly Line Efficiency by Using Lean Manufacturing Tools and Line Balancing Techniques
    Mortada, Anass
    Soulhi, Aziz
    ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2023, 17 (04) : 89 - 109
  • [39] Line balancing of two-sided assembly cell in lean manufacturing
    Abu Bakar, Kamarudin
    Musa, Anis Masyitah
    PROCEEDINGS OF MECHANICAL ENGINEERING RESEARCH DAY 2019 (MERD'19), 2019, : 227 - 229
  • [40] Variant flexibility in assembly line balancing under the premise of feasibility robustness
    Fisel, Johannes
    Exner, Yannick
    Stricker, Nicole
    Lanza, Gisela
    51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 774 - 779