Balancing assembly line with skilled and unskilled workers

被引:106
|
作者
Corominas, Albert [1 ]
Pastor, Rafael [1 ]
Plans, Joan [1 ]
机构
[1] Univ Politecn Cataluna, IOC Res Inst, E-08028 Barcelona, Spain
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2008年 / 36卷 / 06期
关键词
line balancing; application; manufacturing; production;
D O I
10.1016/j.omega.2006.03.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we present the process of rebalancing the line at motorcycle-assembly plant. The company found it necessary to rebalance its line, since it needs to increase production in the spring and summer months. The main characteristics of the problem are as follows: (i) the company hires temporary staff, who need more time to carry out their tasks than permanent workers; (ii) there must always be at least one skilled employee working alongside an unskilled one; and (iii) different task groups are incompatible with each other (clean-hands tasks and dirty-hands tasks). The goal is to minimise the number of temporary workers required, given a cycle time and the team of workers on staff. The problem is modelled as a binary linear program (BLP) and solved optimally by means of the ILOG CPLEX 9.0 optimiser. The solution provided, namely 12 permanent workers (skilled) and two temporary workers (unskilled), is an improvement on the solution implemented by the business, which involved 12 permanent workers and four temporary workers. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1126 / 1132
页数:7
相关论文
共 50 条
  • [1] Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers
    Kim, Dongwook
    Park, Jinwoo
    Moon, Ilkyeong
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 : 324 - 331
  • [2] Lean line balancing for an electronics assembly line
    Nguyen Thi Lam
    Le Minh Toi
    Vu Thi Thanh Tuyen
    Do Ngoc Hien
    13TH GLOBAL CONFERENCE ON SUSTAINABLE MANUFACTURING - DECOUPLING GROWTH FROM RESOURCE USE, 2016, 40 : 437 - 442
  • [3] Assembly line balancing with parallel workstations
    alvarez-Miranda, Eduardo
    Chace, Sebastian
    Pereira, Jordi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (21) : 6486 - 6506
  • [4] On the complexity of assembly line balancing problems
    Alvarez-Miranda, Eduardo
    Pereira, Jordi
    COMPUTERS & OPERATIONS RESEARCH, 2019, 108 : 182 - 186
  • [5] A versatile algorithm for assembly line balancing
    Boysen, Nils
    Fliedner, Malte
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (01) : 39 - 56
  • [6] Dynamic Control of Skilled and Unskilled Labour Task Assignments
    Vu Thanh Le
    Zhang, James
    Johnstone, Michael
    Nahavandi, Saeid
    Creighton, Doug
    2013 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS (AIM): MECHATRONICS FOR HUMAN WELLBEING, 2013, : 955 - 960
  • [7] EUREKA - A HYBRID SYSTEM FOR ASSEMBLY LINE BALANCING
    HOFFMANN, TR
    MANAGEMENT SCIENCE, 1992, 38 (01) : 39 - 47
  • [8] Theory of Assembly Buffer for Line Balancing Problem
    Yu, J. J.
    Zhang, D. C.
    Zhou, M. X.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1061 - 1064
  • [9] A comparative evaluation of assembly line balancing Heuristics
    S. G Ponnambalam
    P. Aravindan
    G. Mogileeswar Naidu
    The International Journal of Advanced Manufacturing Technology, 1999, 15 : 577 - 586
  • [10] A comparative evaluation of assembly line balancing heuristics
    Ponnambalam, SG
    Aravindan, P
    Naidu, GM
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1999, 15 (08) : 577 - 586