Which Organizational and Individual Factors Predict Success vs. Failure in Procurement Projects

被引:4
作者
Strang, Kenneth David [1 ]
机构
[1] USA & RMIT Univ, W3 Res, Melbourne, Australia
关键词
Government Technology Procurement; Professional Certification; Technology Project Management; MANAGEMENT CERTIFICATION; SELECTION; QUALITY;
D O I
10.4018/IJITPM.2021070102
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Project manager (PM) certification and other commonly-tested independent factors were deductively examined using logistic regression to develop an explanatory model of high-priced public procurement project success versus failure. Overall 59% were successful, and 41% failed. The model correctly classified 67.3% of the 2,692 projects, yielding a significant 12% effect size. Individual factors, PM experience, certification, and contractor quality, impacted performance, but contractor size, revenue, industry type, PM age, gender, and education had negligible effect on performance. Quality was in the opposite hypothesized direction. Certified PMs were more likely to achieve successful projects rather than encounter failures. Future research advice was offered.
引用
收藏
页码:19 / 39
页数:21
相关论文
共 49 条
  • [1] [Anonymous], 2017, A Guide to the SCRUM BODY OF KNOWLEDGE (SBOK TM GUIDE) Third Edition A Comprehensive Guide to Deliver Projects using Scrum Includes two chapters about Scaling Scrum for Large Projects and the Enterprise
  • [2] [Anonymous], 2010, PUBLICATION MANUAL A
  • [3] [Anonymous], 2010, Multivariate data analysis: A global perspective, DOI DOI 10.1002/9781119409137.CH4
  • [4] Why e-government projects fail? An analysis of the Healthcare.gov website
    Anthopoulos, Leonidas
    Reddick, Christopher G.
    Giannakidou, Irene
    Mavridis, Nikolaos
    [J]. GOVERNMENT INFORMATION QUARTERLY, 2016, 33 (01) : 161 - 173
  • [5] Barrows Matthew, 2020, International Journal of Construction Education and Research, V16, P61, DOI 10.1080/15578771.2019.1575936
  • [6] Berthold K.R., 2019, International Journal for Empirical Education and Research, V3, P43, DOI DOI 10.35935/EDR/35932.35642
  • [7] An empirical approach to the evaluation of defence contractor performance
    Borbath, Michael
    Blessner, Paul
    Olson, Bill
    [J]. INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2019, 22 (02) : 138 - 153
  • [8] Brennan L, 2015, PALGRAVE HANDBOOK OF RESEARCH DESIGN IN BUSINESS AND MANAGEMENT, P81
  • [9] Carlton D., 2019, Journal of Modern Project Management, V7, P68, DOI [DOI 10.19255/JMPM02004, 10.1007/978-3-030-04315-5_16, DOI 10.1007/978-3-030-04315-5_16]
  • [10] Project Management Competences by Teaching and Research Staff for the Sustained Success of Engineering Education
    Cerezo-Narvaez, Alberto
    de los Rios Carmenado, Ignacio
    Pastor-Fernandez, Andres
    Yague Blanco, Jose Luis
    Otero-Mateo, Manuel
    [J]. EDUCATION SCIENCES, 2019, 9 (01):