Model of generic project risk element transmission theory based on data mining

被引:5
作者
Li Cun-bin [1 ]
Wang Jian-jun [1 ]
机构
[1] N China Elect Power Univ, Sch Business Adm, Beijing 102206, Peoples R China
来源
JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY | 2008年 / 15卷 / 01期
基金
中国国家自然科学基金;
关键词
data mining; risk element; risk management; project management;
D O I
10.1007/s11771-008-0026-7
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
In order to construct the data mining frame for the generic project risk research, the basic definitions of the generic project risk element were given, and then a new model of the generic project risk element was presented with the definitions. From the model, data mining method was used to acquire the risk transmission matrix from the historical databases analysis. The quantitative calculation problem among the generic project risk elements was solved. This method deals with well the risk element transmission problems with limited states. And in order to get the limited states, fuzzy theory was used to discrete the historical data in historical databases. In an example, the controlling risk degree is chosen as P(R-s >= 12) <= 0.1, it means that the probability of risk state which is not less than 2 in project is not more than 0.1, the risk element R-3 is chosen to control the project, respectively. The result shows that three risk element transmission matrix can be acquired in 4 risk elements, and the frequency histogram and cumulative frequency histogram of each risk element are also given.
引用
收藏
页码:132 / 135
页数:4
相关论文
共 17 条
[1]   Compartment fire risk analysis by advanced Monte Carlo simulation [J].
Au, Siu Kui ;
Wang, Zhi-Hua ;
Lo, Siu-Ming .
ENGINEERING STRUCTURES, 2007, 29 (09) :2381-2390
[2]  
BELACEL N, 2000, EUR J OPER RES, V1, P175
[3]   Learning multicriteria fuzzy classification method PROAFTN from data [J].
Belacel, Nabil ;
Raval, Hiral Bhasker ;
Punnen, Abraham P. .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (07) :1885-1898
[4]   Global supplier development considering risk factors using fuzzy extended AHP-based approach [J].
Chan, Felix T. S. ;
Kumar, Niraj .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04) :417-431
[5]   Applications of the extent analysis method on fuzzy AHP [J].
Chang, DY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (03) :649-655
[6]   Mining association rule efficiently based on data warehouse [J].
Chen, XH ;
Lai, BC ;
Luo, D .
JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2003, 10 (04) :375-380
[7]  
GLOBERSON S, 1994, INT J PROJ MANAG, V12, P165, DOI DOI 10.1016/0263-7863(94)90032-9
[8]  
HENRY EJ, 1988, RELIABILITY ENG RISK
[9]  
Hu W, 2006, PROCEEDINGS OF 2006 CIE INTERNATIONAL CONFERENCE ON RADAR, VOLS 1 AND 2, P288
[10]   Economic evaluation of the solar carbothermic reduction of ZnO by using a single sensitivity analysis and a Monte-Carlo risk analysis [J].
Kraupl, Stefan ;
Wieckert, Christian .
ENERGY, 2007, 32 (07) :1134-1147