PRODUCTION CYCLE TIME REDUCTION IN LOW AND MEDIUM-LOW-TECH COMPANIES: A CASE STUDY FOR SERBIA

被引:4
作者
Klarin, Milivoj [1 ]
Brkic, Vesna Spasojevic [2 ]
Golubovic, Tamara [2 ]
Stanisavljev, Sanja [1 ]
Brkic, Aleksandar [3 ]
Sajfert, Zvonko [1 ]
机构
[1] Univ Novi Sad, Tech Fac Mihajlo Pupin, Zrenjanin 23000, Serbia
[2] Univ Belgrade, Fac Mech Engn, Kraljice Marije 16, Belgrade 11000, Serbia
[3] Univ Belgrade, Fac Mech Engn, Innovat Ctr, Kraljice Marije 16, Belgrade 11000, Serbia
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2016年 / 23卷 / 04期
关键词
low and medium-tech companies; production cycle; time components of production cycle; SYSTEM;
D O I
10.17559/TV-20140715130015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Serbia is a developing country, which among other things implies underdeveloped industrial base. A fact is that more than two thirds of all Serbian industry includes low-tech and medium-low-tech companies. These companies should implement tools and methods that are simple and low cost, but effective and helpful in a way that will increase their productivity and product quality. This paper suggests such a method for obtaining production cycle time components, and verifies it through a case study conducted during three years in one Serbian company. Practical result of this research is that application of the proposed method leads to reducing production cycle time, increasing production time, increasing production and increasing overall satisfaction and engagement of the executor.
引用
收藏
页码:1103 / 1108
页数:6
相关论文
共 16 条
[1]  
[Anonymous], 2011, SUSTAINABLE IND POLI
[2]  
Barnes R.M., 1957, Work sampling
[3]  
Cala I., 2011, I International Symposium Engineering Management and Competitiveness, P21
[4]   The optimal production cycle time in an integrated production-inventory model for decaying raw materials [J].
Chung, Kun-Jen ;
Hou, Kuo-Lung ;
Lan, Shaw-Ping .
APPLIED MATHEMATICAL MODELLING, 2009, 33 (01) :1-10
[5]   Rapid video-based analysis system for advanced work measurement [J].
Elnekave, M ;
Gilad, I .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (02) :271-290
[6]   Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle [J].
Giri, BC ;
Yun, WY .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 95 (02) :229-243
[7]   A framework for reducing manufacturing throughput time [J].
Johnson, DJ .
JOURNAL OF MANUFACTURING SYSTEMS, 2003, 22 (04) :283-298
[8]   Manufacturing Cycle Time Analysis and Scheduling to Optimize Its Duration [J].
Jovanovic, Jelena R. ;
Milanovic, Dragan D. ;
Djukic, Radisav D. .
STROJNISKI VESTNIK-JOURNAL OF MECHANICAL ENGINEERING, 2014, 60 (7-8) :512-524
[9]  
Jovanovic T. M., 1996, SAVREMENA ORG UPRAVL
[10]  
Klarin M. M., 2010, J PROCESS MECH ENG E, V224