Probabilistic evaluation of initiation time in RC bridge beams with load-induced cracks exposed to de-icing salts

被引:41
作者
Lu, Zhao-Hui [1 ]
Zhao, Yan-Gang [2 ]
Yu, Zhi-Wu [1 ]
Ding, Fa-Xing [1 ]
机构
[1] Cent S Univ, Sch Civil Engn & Architecture, Changsha 410075, Hunan, Peoples R China
[2] Kanagawa Univ, Dept Architecture & Bldg Engn, Kanagawa Ku, Yokohama, Kanagawa 2218686, Japan
基金
国家高技术研究发展计划(863计划); 中国国家自然科学基金;
关键词
Reinforced concrete beams; Chloride; Load-induced cracks; Corrosion initiation; Probabilistic model; CHLORIDE-INDUCED CORROSION; REINFORCED-CONCRETE; SERVICE LIFE; THRESHOLD CHLORIDE; PREDICTION; DIFFUSION; RELIABILITY; BARS;
D O I
10.1016/j.cemconres.2010.12.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, a reliability-based method for predicting the initiation time of reinforced concrete bridge beams with load-induced cracks exposed to de-icing salts is presented. A practical model for predicting the diffusion coefficient of chloride ingress into load-induced cracked concrete is proposed. Probabilistic information about uncertainties related to the surface chloride content and the threshold chloride concentration has been estimated from a wide review of previous experimental or statistical studies. Probabilistic analysis to estimate the time to corrosion initiation with/without considering the effect of the load-induced cracks on the chloride ingress into concrete has been carried out. Results of the analysis demonstrate the importance of considering the effect of the load-induced cracks for correct prediction of corrosion initiation in RC bridge beams exposed to chlorides. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:365 / 372
页数:8
相关论文
共 51 条
[21]  
Hussain SE, 1996, ACI MATER J, V93, P534
[22]   FACTORS AFFECTING THRESHOLD CHLORIDE FOR REINFORCEMENT CORROSION IN CONCRETE [J].
HUSSAIN, SE ;
RASHEEDUZZAFAR ;
ALMUSALLAM, A ;
ALGAHTANI, AS .
CEMENT AND CONCRETE RESEARCH, 1995, 25 (07) :1543-1555
[23]   Chloride-induced corrosion of reinforced concrete bridge decks [J].
Kassir, MK ;
Ghosn, M .
CEMENT AND CONCRETE RESEARCH, 2002, 32 (01) :139-143
[24]   THE CL-/OH- RATIO IN CHLORIDE-CONTAMINATED CONCRETE - A MOST IMPORTANT CRITERION [J].
KAYYALI, OA ;
HAQUE, MN .
MAGAZINE OF CONCRETE RESEARCH, 1995, 47 (172) :235-242
[25]   Impact of specification changes on chloride-induced corrosion service life of bridge decks [J].
Kirkpatrick, TJ ;
Weyers, RE ;
Sprinkel, MM ;
Anderson-Cook, CM .
CEMENT AND CONCRETE RESEARCH, 2002, 32 (08) :1189-1197
[26]  
Maage M, 1996, ACI MATER J, V93, P602
[27]  
Maeda S., 2004, DOBOKU GAKKAI RONBUN, V2004, P109, DOI [https://doi.org/10.2208/jscej.2004.760_109, DOI 10.2208/JSCEJ.2004.760_109]
[28]   A semi-closed-form solution for chloride diffusion in concrete with time-varying parameters [J].
Maheswaran, T ;
Sanjayan, JG .
MAGAZINE OF CONCRETE RESEARCH, 2004, 56 (06) :359-366
[29]   PREDICTION OF LONG-TERM CHLORIDE CONCENTRATION IN CONCRETE [J].
MANGAT, PS ;
MOLLOY, BT .
MATERIALS AND STRUCTURES, 1994, 27 (170) :338-346
[30]   PREDICTION OF FREE CHLORIDE CONCENTRATION IN CONCRETE USING ROUTINE INSPECTION DATA [J].
MANGAT, PS ;
MOLLOY, BT .
MAGAZINE OF CONCRETE RESEARCH, 1994, 46 (169) :279-287